Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/27/2017 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The house is vacant and secured. All the work has been done on the repairs of the interior of the kitchen and the dinning room. The porch has been replaced, the storage room has been rebuilt and the permit has been issued and inspection have been finaled. T16CM09175 issued on 1-25-17 and finaled on 3-24-17. At this time the case will be closed. Violation Abated, Close Case. RV. |
| 01/17/2017 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
House is vacant and secured. No work has been done and the plans are approved and waiting for payment to have the permit issued. Did talk to the contractor and the draftsman and the plans are completed and the contractor is waiting to be funded before the work gets started. There is an issue with the bank on the deposit made and the money not being in the account. Will check in 60 days. RV. |
| 11/07/2016 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The house is vacant and secured. Does have storage containers on the property for the items that were in the house. Does have several lock boxes on the security bars by the front door. The electrical has been turned back on. The rear porch is still up and no work has been done to repair the damaged area from the fire. Will check in in 60 days. RV. |