Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T16DV02961

Parcel: 107131140


Addresses:

297 W KELSO ST

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
05/14/2016 INSP - INITIAL CODE ENFORCMENT Approved VISITED SITE, MET WITH OWNERS IN UNIT #15 FIRST. FOUND TENANT NOT HOME BUT UNIT WAS OPENED UP BY A DAUGHTER ALSO LIVING IN THE COMPLEX. OWNER STATED THAT THE TENNANT WA IN THE PROCESS OF MOVING OUT, HAS UNTIL TUESDAY OR WEDNESDAY TO BE OUT. DID FIND SEWER WATER THRU OUT THE UNIT THAT HAD BACKED UP OUT OF THE TOILET. OWNERS HAD CONTACTED TNT WATER RESTORATION AND B&M PROFFESIOAL PLUMBING. FINDING AREAS FOLLOWS:
>WALKED THE COMPLEX WITH TIM OF B&M PLUMBING AGREED EACH INDIVIDUAL CLEAN OUT NEEDED TO BE CHECKED AS WELL AS THE MAIN LINE THAT THE CLEAN OUTS CONNECTED TO. TIM STATED HE WOULD SNAKE THE LINE, IF HE FOUND A CLOGGED AREA HE WOULD PROBE THE LINE TO DETERMINE THE BLOCKAGE.
> MR NGUYEN HAD RETRACKTED THE SEWER WATER OUT OF UNITS 15 AND 2, #1 WAS VERY MINIMAL AND CONTAINED TO THE BATHROOM AREA.
>UNIT #2 WAS IN THE PROCESS OF CLEANING THE FLOOR THRU OUT THE UNIT (ALL TILE FLOOR) WITH BLEACH. OTHER LIVED IN #15 AND DAUGHTER STATED SHE WOULD HELP CLEAN THAT UNIT.
>OWNER PAID TENNATS THAT DID THEIR OWN CLEAN UP TO HELP PROVIDE THEM MONEY TO START WASHING ANY CLOTHES OR RUGS THAT GOT DIRTY.
>5 NOV'S WERE ISSUED TO THE OWNER THE FIRST TO SNAKE THE SEWER LINES 1 THRU 20. SECOND NOV WAS TO REMOVE THE SEWER WATER IN THE AFFECTED UNITS AND THEN TO CLEAN THE UNITS. THIRD NOV WAS TO MAKE REPAIRS TO THE WALKWAYS. WHILE ON SITE I FOUND HAZARDOUS AREAS IN THE WALKWAYS THAT HAD DAMAGED OR DETERIORATED PLYWOOD THAT REQUIRED REPAIRS. THE 4TH NOV WAS FOR UNIT #2 TO FOR DRYWALL REPAIRS, REPAIR OR REPLACE THE COOLER AND PROPERLY INSTALL INTERIOR SUPPLY VENTS. POSSIBLE LEAK IN BATHROOM. THE 5TH NOV WAS FOR UNIT #1 WHO HAD A LEAK IN BATHROOM,AND CEILING PATCH REQUIRED IN THE BATHROOM.
>SEWER WAS IN THE PROCESS OF BEING SNAKED, UNITS HAD WATER RETRACTED AND CLEAN UP WAS IN PROGRESS.
WORK IN UNIT 2 ALSO IN PROGRESS. NEW COOLER WAS BROUGHT TO REPLACE THE OLD ONE.

I WAS HAPPY WITH THE WORK IN PROGRESS PRIOR TO EXITING THE COMPLEX.