Case: T16DV02961
Case Details
Entered Date:
05/16/2016
Applicant:
NGUYEN PROPERTIES I LLC
Description:
SEWER BACK UP FLOODED UNITS
Outstanding Inspections
Case Number: T16DV02961
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Outstanding Inspections - 3
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2016 | NPO(PL)-PLUMBING SYSTEM & FX | GOODMAN | Item closed | |
| 07/06/2016 | NPO(PL)-SEWAGE DISPOSAL (SYS) | GOODMAN | Item closed | |
| 07/06/2016 | NPO - OTHER | GOODMAN | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T16DV02961
Case Description: EMERGENCY
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2016 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | VISITED SITE, MET WITH OWNERS IN UNIT #15 FIRST. FOUND TENANT NOT HOME BUT UNIT WAS OPENED UP BY A DAUGHTER ALSO LIVING IN THE COMPLEX. OWNER STATED THAT THE TENNANT WA IN THE PROCESS OF MOVING OUT, HAS UNTIL TUESDAY OR WEDNESDAY TO BE OUT. DID FIND SEWER WATER THRU OUT THE UNIT THAT HAD BACKED UP OUT OF THE TOILET. OWNERS HAD CONTACTED TNT WATER RESTORATION AND B&M PROFFESIOAL PLUMBING. FINDING AREAS FOLLOWS: >WALKED THE COMPLEX WITH TIM OF B&M PLUMBING AGREED EACH INDIVIDUAL CLEAN OUT NEEDED TO BE CHECKED AS WELL AS THE MAIN LINE THAT THE CLEAN OUTS CONNECTED TO. TIM STATED HE WOULD SNAKE THE LINE, IF HE FOUND A CLOGGED AREA HE WOULD PROBE THE LINE TO DETERMINE THE BLOCKAGE. > MR NGUYEN HAD RETRACKTED THE SEWER WATER OUT OF UNITS 15 AND 2, #1 WAS VERY MINIMAL AND CONTAINED TO THE BATHROOM AREA. >UNIT #2 WAS IN THE PROCESS OF CLEANING THE FLOOR THRU OUT THE UNIT (ALL TILE FLOOR) WITH BLEACH. OTHER LIVED IN #15 AND DAUGHTER STATED SHE WOULD HELP CLEAN THAT UNIT. >OWNER PAID TENNATS THAT DID THEIR OWN CLEAN UP TO HELP PROVIDE THEM MONEY TO START WASHING ANY CLOTHES OR RUGS THAT GOT DIRTY. >5 NOV'S WERE ISSUED TO THE OWNER THE FIRST TO SNAKE THE SEWER LINES 1 THRU 20. SECOND NOV WAS TO REMOVE THE SEWER WATER IN THE AFFECTED UNITS AND THEN TO CLEAN THE UNITS. THIRD NOV WAS TO MAKE REPAIRS TO THE WALKWAYS. WHILE ON SITE I FOUND HAZARDOUS AREAS IN THE WALKWAYS THAT HAD DAMAGED OR DETERIORATED PLYWOOD THAT REQUIRED REPAIRS. THE 4TH NOV WAS FOR UNIT #2 TO FOR DRYWALL REPAIRS, REPAIR OR REPLACE THE COOLER AND PROPERLY INSTALL INTERIOR SUPPLY VENTS. POSSIBLE LEAK IN BATHROOM. THE 5TH NOV WAS FOR UNIT #1 WHO HAD A LEAK IN BATHROOM,AND CEILING PATCH REQUIRED IN THE BATHROOM. >SEWER WAS IN THE PROCESS OF BEING SNAKED, UNITS HAD WATER RETRACTED AND CLEAN UP WAS IN PROGRESS. WORK IN UNIT 2 ALSO IN PROGRESS. NEW COOLER WAS BROUGHT TO REPLACE THE OLD ONE. I WAS HAPPY WITH THE WORK IN PROGRESS PRIOR TO EXITING THE COMPLEX. |
| 07/06/2016 | INSP - FOLLOW UP CODE ENFORCE | GOODMAN | Approved | FOLLOW UP INSPECTION FOUND: >ALL ISSUES IN UNIT #2 INCLUDING SEWER BACK UP ABATED ON 5/14/16 >WATER RETRACTED FROM BOTH 2 & 15 ON 5/14/16 >LEAK LOCATED IN UNIT 1 AND REPAIRED, CEILING TAPED TEXTURED AND PAINTED AS OF 5/24/16 >INDOOR - OUTDOOR CARPET REMOVED FROM THE WALKWAY AREAS. NEW 3/4 INCH PLYWOOD REPLACED THE ENTIRE WALKWAY AREAS. WALKWAYS PROPERLY COATED. COMPLIANCE / CLOSE CASE. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T16DV02961
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 05/26/2016 | CONTACTED IN PERSON |
| 05/26/2016 | CONTACTED BY MAILING |
| 05/26/2016 | NOTICE OF VIOLATION ISSUED |
| 11/08/2016 | VIOLATION CLOSED |