Inspection Status: Approved
Inspection History: BUILDING - PROGRESS
| Date |
Description |
Inspector |
Results |
Comments |
| 09/22/2017 |
BUILDING - PROGRESS |
|
Approved |
|
| 05/01/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
RETAINING WALL FOOTING AT NORTH SIDE OF PARKING STRUCTURE, GL: AW/1 - 18. OK TO PLACE CONCRETE. |
| 03/21/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
ELECTRIC TEMPORARY POWER. POWER FROM CANCER CENTER TO PARKING STRUCTURE ELECTRIC ROOM (PANEL 1) TO MEDICAL CENTER PANELS: PT1; PT2-A; PT3-B. OK TO ENERGIZETEMPPOWER SYSTEM. |
| 03/02/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
ROOF DRAINS: LEVEL #2, GL: 13/BE (PRIMARY), LEVEL #1 GL: 13/BE (PRIMARY) |
| 02/06/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
CMU WALLS AT 16' - 20': S.E. STAIRWELL, S.W. STAIRWELL, ELEVATOR AREA. OK TO GROUT PROGRESS AREAS. |
| 02/03/2017 |
BUILDING - PROGRESS |
|
Not ready for Inspection |
|
| 01/25/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
CMU WALLS AT SE STAIRS AT 17'4"; SW STAIRWELL AND ELEVATOR AREA AT LIFT 3 - 4. OK TO GROUT PROGRESS AREAS. |
| 01/24/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
BUILDING PRE-SLAB: LEVEL #2, SLAB AT GL: CW.5 - CW/9 - 18. OK TO PLACE CONCRETE. |
| 01/23/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
MASONRY PRE-GROUT: SE STAIRWELL AT 12' - 16' GL: CE.8 -DE/ 18; ELEVATOR WALLS (E, W,N) AT 8' - 12'; SW STAIR WELL WALL AT 12' - 16' (NORTH WALL), GL 1/CW.5. OK TO GROUT PROGRESS AREAS. |
| 01/20/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
NOT READY - RAMP SLAB AT 3 - 2.5 |
| 01/12/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
LEVEL #2: SLABS #1 AND #3 HAVE BEEN POURED. |
| 01/11/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
LEVEL #2; SLAB #1; OK TO PLACE CONCRETE. |
| 01/10/2017 |
BUILDING - PROGRESS |
|
Partial Approval |
PRE-SLAB: LEVEL #2; SLABS 3 AND 4; CLEAN PROGRESS AREAS. OK TO PLACE CONCRETE. |
| 12/28/2016 |
BUILDING - PROGRESS |
|
Partial Approval |
PRE-SLAB: LEVEL #1; SLAB #3 GL: 5.8 -8/AW - DW. OK TO PLACE CONCRETE |
| 12/27/2016 |
BUILDING - PROGRESS |
|
Not ready for Inspection |
PLUMBING AND ELECTRIC UNDERGROUND NOT READY FOR INSPECTION. |