Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2017 | MECHANICAL - FINAL | Approved | ||
| 08/08/2017 | MECHANICAL - FINAL | Partial Approval | PENDING APPROVAL OF AIR BALANCE REPORT FOLLOWING ARE ROBERT SHERRY'S COMMENTS FROM HIS REVIEW OF THE AIR BALANCE REPORT. 1.The balancing technician noted "multiple areas of smoke rollout" when testing the hoods for smoke containment. Corrective action is required by the contractor and the test is to be repeated. 2.FC-1 is noted as having no means of balancing but the mechanical drawing shows balancing dampers being installed at each duct branch. (Required per Section 603.18, IMC 2012). 3.The ceiling diffuser for room 103 (waiting area) has been eliminated from FC-1. Was this an approved revision to the design? |