Permit: T16CM05075

Parcel: 11202003D


Addresses:

3838 N CAMPBELL AV


Inspection Status: Partial Approval

Inspection History: SITE - SEWER

Permit Number - T16CM05075

Inspection Description - SITE - SEWER

Inspection Status - Partial Approval

Date Description Inspector Results Comments
10/10/2016 SITE - SEWER Partial Approval MAN HOLE #5; PREPPED AND GROUTED. OK TO ACIVATE.
10/07/2016 SITE - SEWER Partial Approval MAN HOLE #1 - PIPE CUT AND PATCHED. OK TO ACTIVATE
09/02/2016 SITE - SEWER Partial Approval MANHOLE TEST AT MH #1 - 5, PRESSURE TESTED, LATERALS OBSERVED BY ENGINEER OF RECORD (DIBBLE; GREG). RESULTS OF TESTING TO BE FORWARDED TO THIS OFFICE.
09/01/2016 SITE - SEWER Partial Approval 8" WATER LINE (APPROXIMATELY 160') GL: 20 NORTH. OK TO COVER PROGRESS AREA.
08/31/2016 SITE - SEWER Partial Approval 8" WATER LINE (APPROXIMATELY 184') AT GL: A (NORTH) TO GL: 16 - 20; LATERALS (20' NORTH AND SOUTH) AT GL: 20 EAST. OK TO COVER PROGRESS AREAS.
08/30/2016 SITE - SEWER Partial Approval INFORMATION: SET UP MANHOLE INSPECTION (5) FOR 2 SEPTEMBER AT 0830 HOURS
08/24/2016 SITE - SEWER Partial Approval MAN HOLE #4 - FORMED AND COMPLETE. 8" WATER LINE; APPROXIMATELY 575' (NORTH OF PARKING STURCTURE TO EAST END; SOUTH TO AREA BETWEEN BUILDING AND PARKING STRUCTURE: OK TO COVER PROGRESS AREAS.
08/24/2016 SITE - SEWER Partial Approval 8" SEWER LINE (APPROXIMATELY 75") GL: 20/A EAST. OK TO COVER PROGRESS AREA.
08/11/2016 SITE - SEWER Not ready for Inspection RAINED OUT
08/09/2016 SITE - SEWER Not ready for Inspection RAINED OUT
07/29/2016 SITE - SEWER Partial Approval 8" SEWER LINE EAST OF MH #3, APPROXIMATELY 35', MH #3 WALLS COMPLETE: OK TO COVER PROGRESS AREA
07/28/2016 SITE - SEWER Partial Approval LATERAL TO MH #4, APPROXIMATELY 25' NE OF BUILDING
07/26/2016 SITE - SEWER Not ready for Inspection
07/22/2016 SITE - SEWER Partial Approval LATERAL LINE TO MH #3 - APPROXIMATELY 50'; BASE FOR MH #2 POURED
07/22/2016 SITE - SEWER Partial Approval 8" LATERAL SEWER LINE TO MAN HOLE #3, APPROXIMATELY 75'. OK TO COVER PROGRESS AREA.
07/21/2016 SITE - SEWER Partial Approval 8' SEWER LINE FROM MAN HOLE #2 EAST FOR APPROXIMATELY 100', OK TO COVER PROGRRESS AREA
07/19/2016 SITE - SEWER Partial Approval 8" SEWER LINE FROM MH #1 TO EAST; APPROXIMATELY 200'. OK TO COVER PROGRESS AREAS. MAN HOLE#1: WALLS POURED
07/19/2016 SITE - SEWER Partial Approval 8' SEWER LINE FROM MAN HOLE #2, EAST APPROXIMATELY 100' OK TO COVER PROGRESS AREA