Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2016 | PLUMBING - INTERMEDIATE | Approved | ||
| 12/20/2016 | PLUMBING - INTERMEDIATE | Not ready for Inspection | EXPOSE ALL WASTE LINES BETWEEN BUILDINGS INSTALL CLEANOUT IN 3" WASTE LINE RE-GRADE PIPE TO OBTAIN NECESSARY PITCH |
|
| 09/08/2016 | PLUMBING - INTERMEDIATE | Denied | 1. VENT FITTINGS USED UNDER SLAB ARE NOT PERMITTED. 2. ALL PLUMBING UNDER SLAB MUST BE EXPOSED FOR INSPECTION. 3. 10' WATER TEST WILL BE REQUIRED ON ALL DWV PIPING. (ALL ABOVE LISTED ITEMS MUST BE CORRECTED BEFORE WORK CONTINUES.) |
|
| 08/24/2016 | PLUMBING - INTERMEDIATE | Not ready for Inspection |