Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2016 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 09/29/2016 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | MET WITH CONTRACTOR ON SITE, PREVIOUS CONTRACTOR DID NOT CALL IN ANY INSPECTIONS AND THEY DIDN'T HAVE APPROVED PRINTS ON SITE. | |
| 08/03/2016 | PLUMBING - ROUGH, SOIL | Partial Approval | WASTE VENT REQUIRED ON DISCHAGE SIDE OF GREASE TRAP, PER MFG. INTALL. INST. | |
| 08/02/2016 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/02/2016 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | grease trap vent to be on discharge side of receptor dwv not on test |