Permit: T16CM03514

Parcel: 11202003D

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T16CM03514

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
04/11/2019 PLUMBING - INTERMEDIATE Approved
09/21/2018 PLUMBING - INTERMEDIATE Partial Approval PET CT ROOMS #139 THROUGH #145.
01/31/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, WEST; WASTE AND VENT LINES 2 1/2" IN AREAS D/4, E/5, E/6, F/7.
01/24/2018 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES ON LEVEL #3; EAST AND WEST PORTION OF BUILDING. LINES AT 2" - 4" - ALL AREAS ARE GOOD EXCEPT FOR WEST SIDE SYSTEMS: D/4 - NORTH; E/5 - NORTH; F/6 - WEST, F/7 - WEST. AREAS IN QUESTION WILL NOT MAINTAIN TEST AIR PRESSURE.
01/18/2018 PLUMBING - INTERMEDIATE Not ready for Inspection SYSTEMS AT E-4 AND F-7 ARE LEAKING. RECALL WHEN SYSTEM IS HOLDING PRESSURE
01/17/2018 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE, WILL RESCHEDULE FOR 18 JAN 18.
01/15/2018 PLUMBING - INTERMEDIATE Partial Approval EXAM ROOMS #1B144, 1B145 - PLUMBING ROUGH SOIL. OK TO COVER.
01/11/2018 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE.
01/10/2018 PLUMBING - INTERMEDIATE Partial Approval (MECHANICAL ABOVE CEILING) CHILLED WATER LINES (SUPPLY AND RETURN); 1" - 1 1/2" LINES AT GL: G/14 - 17.
01/05/2018 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED.
01/04/2018 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED, WORK INCOMPLETE
01/03/2018 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED, WORK INCOMPLETE.
01/02/2018 PLUMBING - INTERMEDIATE Partial Approval CHILLED WATER LINES (2"), SUPPLY AND RETURN. AREA A; GL: C - E/2 - 5. OK TO INSULATE PROGRESS AREAS.
12/26/2017 PLUMBING - INTERMEDIATE Partial Approval INFORMATION ONLY - SCHEDULING FOR AFTER HOURS INSPECTIONS.
12/22/2017 PLUMBING - INTERMEDIATE Cancelled
12/21/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE
12/21/2017 PLUMBING - INTERMEDIATE Cancelled RESCHEDULED FOR 26 DEC.
12/19/2017 PLUMBING - INTERMEDIATE Partial Approval INFORMATION ONLY
12/18/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE.
12/15/2017 PLUMBING - INTERMEDIATE Cancelled
12/14/2017 PLUMBING - INTERMEDIATE Partial Approval LINAEXS #1 - 4, WATER PUMPS FOR WATER SUPPLY AND RETURN WATER; LINES 3/4" - 2".
12/13/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED
12/12/2017 PLUMBING - INTERMEDIATE Partial Approval PCW PUMP SYSTEM (ROOM #221) - FOR LINAX SYSTEM. BOILER ROOM #184: DRAINS, SUPPLY AND RETURN HOT LINES. OK TO INSULATE ALL APPROPRIATE LINES.
12/11/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED - WORK INCOMPLETE.
12/07/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED
12/06/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE
12/05/2017 PLUMBING - INTERMEDIATE Partial Approval INFORMATION FOR DRAINAGE LINES FOR ELEVATOR SUMP SYSTEM
12/04/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED.
12/01/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED.
11/30/2017 PLUMBING - INTERMEDIATE Partial Approval COPPER DISCHARGE LINES (2" - 3") FOR ELEVATOR SUMP PUMPS. ELEVATORS #1 - 4.
11/29/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED.
11/28/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED.
11/27/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE
11/22/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE
11/21/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED, WORK INCOMPLETE.
11/20/2017 PLUMBING - INTERMEDIATE Cancelled WORK INC0MPLETE
11/17/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE
11/16/2017 PLUMBING - INTERMEDIATE Cancelled CONTRACTOR CANCELLED
11/15/2017 PLUMBING - INTERMEDIATE Not ready for Inspection CONTRACTOR CANCELLED.
11/14/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE
11/13/2017 PLUMBING - INTERMEDIATE Partial Approval DOMESTIC WATER LINES (HOT AND COLD) N LINAC S #1, 2, 3.
11/09/2017 PLUMBING - INTERMEDIATE Partial Approval DOMESTIC HOT AND COLD WATER: (1/2" - 2 1/2" LINES) FOR SERVICE TO NORTHWEST AREAS. MEDICAL GAS TEST: MED GAS LINES (1/2" - 2 1/2" LINES) TO HRD VAULT. OXYGEN, MED AIR, VACUUM, MAGD.
11/06/2017 PLUMBING - INTERMEDIATE Partial Approval LINAC #2, IN WALL PLUMBING.
11/02/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE: WILL RESCHEDULE THE WEEK OF 6 NOV 17
11/01/2017 PLUMBING - INTERMEDIATE Cancelled WORK NOT COMPLETED
10/31/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE.
10/30/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE.
10/27/2017 PLUMBING - INTERMEDIATE Cancelled WORK INCOMPLETE.
10/26/2017 PLUMBING - INTERMEDIATE Partial Approval IN WALL PLUMBING IN LINAC #1, OK TO COVER WALLS.
10/19/2017 PLUMBING - INTERMEDIATE Cancelled WORK NOT COMPLETE.
10/18/2017 PLUMBING - INTERMEDIATE Partial Approval GAS LINES TO WATER HEATERS (1" - 2"); VAULT #2, MED GAS LINES (1/2" - 3/4"), TESTED AT 150psi.
10/17/2017 PLUMBING - INTERMEDIATE Cancelled
10/16/2017 PLUMBING - INTERMEDIATE Cancelled
10/13/2017 PLUMBING - INTERMEDIATE Cancelled
10/12/2017 PLUMBING - INTERMEDIATE Cancelled
10/11/2017 PLUMBING - INTERMEDIATE Partial Approval GREASE TRAP IN PLACE; CLEAN-OUTS AND VENTS. OK TO COVER PROGRESS AREA.
10/10/2017 PLUMBING - INTERMEDIATE Cancelled
10/09/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AAN VENT LINES (1 1/2" - 2"LINES) GL: G/20, WASTE AND VENT LINES IN VAULT #2; VAULT #3; HDR ROOM (1 1/2" - 3): VAULT #3, MECHANICAL LINES (1/2" - 3/4"). air lines (1/2" - 3/4") in rooms 10196 - 97
10/05/2017 PLUMBING - INTERMEDIATE Partial Approval VAULT #1; WASTE AND VENT LINES AT 2" - TESTED AT 125 psi. VAULT #2; DEMESTIC WATER (HOT AND COLD) 1/2" LINES. OK TO INSULATE. MCHANICAL PIPING: 2 LINES AT 1"; TESTED AT 100psi.

VAULT #4: CAST IRON WASTE AND VENT LINES AT (2").
10/04/2017 PLUMBING - INTERMEDIATE Cancelled ORK NOT COMPLETE.
10/03/2017 PLUMBING - INTERMEDIATE Partial Approval CHILLED WATER LINES (1") IN VAULT #1 AND VAULT #4; DOMESTIC WATER LINES (1/2") HOT AND COLD IN VAULT #1.
10/02/2017 PLUMBING - INTERMEDIATE Cancelled
09/29/2017 PLUMBING - INTERMEDIATE Cancelled
09/28/2017 PLUMBING - INTERMEDIATE Partial Approval DECONTAMINATION ROOM: DOMESTIC WASTER LINES (1/2" - 1") COPPER AND PLASTIC.
09/27/2017 PLUMBING - INTERMEDIATE Cancelled
09/26/2017 PLUMBING - INTERMEDIATE Cancelled
09/22/2017 PLUMBING - INTERMEDIATE Cancelled
09/21/2017 PLUMBING - INTERMEDIATE Cancelled
09/20/2017 PLUMBING - INTERMEDIATE Cancelled
09/19/2017 PLUMBING - INTERMEDIATE Cancelled
09/18/2017 PLUMBING - INTERMEDIATE Cancelled
09/15/2017 PLUMBING - INTERMEDIATE Cancelled WORK NOT COMPLETED.
09/11/2017 PLUMBING - INTERMEDIATE Cancelled
09/08/2017 PLUMBING - INTERMEDIATE Cancelled
09/07/2017 PLUMBING - INTERMEDIATE Not ready for Inspection CONTRACTOR CANCELLED.
09/06/2017 PLUMBING - INTERMEDIATE Cancelled WPRL INCOMPLETE.
09/05/2017 PLUMBING - INTERMEDIATE Cancelled
09/01/2017 PLUMBING - INTERMEDIATE Cancelled
08/31/2017 PLUMBING - INTERMEDIATE Cancelled
08/30/2017 PLUMBING - INTERMEDIATE Cancelled
08/28/2017 PLUMBING - INTERMEDIATE Partial Approval HEATED HOT WATER TESTED AT 100psi; WATER TEST - OK TO FLUSH SYSTEM.
08/25/2017 PLUMBING - INTERMEDIATE Cancelled
08/24/2017 PLUMBING - INTERMEDIATE Partial Approval CAST IRON WASTE AND VENT LINES AT LEVEL #3; GL: 2 - 9/C - F (2" - 4")
08/23/2017 PLUMBING - INTERMEDIATE Cancelled
08/22/2017 PLUMBING - INTERMEDIATE Partial Approval PUMP ROOM: CHILLED AND CHILLED BLENDED LINES TO AIR HANDLERS. TO BE FILLED WITH WATER FOR FINAL TEST.. HEATED HOT WATERLINES (3/4" - 4" LINES): GL: 5 - 12/F - H, TESTED AT 100psi. HEATED HOT WATER LINES AT GL: 9 - 5/D - F TESTED AT 120 psi; (3/4" - 4" LINES)
08/21/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, CHILLED WATER BLENDED (1/2" - 4") LINES GL: 5 - 12/D - F, CHILLED LINES AT 1" - 4", GL 5 - 12/D - F ALL LINES TESTED AT 100 psi, HEATED HOT WATER LINES AT GL: 4 - 12/F - H, CHILLED BLENDED AT 1/2" - 4" GL: 4 - 12/F - H. ALL LINES TESTED AT 100psi.
08/18/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, CAST IRON WASTE AND VENT LINES (1 1/2" - 4"), GL: D - E/12 - 15; F - G/6 - 10.
08/17/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3; GL: 8 - 18/D - F (1/2" - 4") LINES; BLENDED, HEATED HOT, CHILLED WATER LINES - ALL TESTED AT 100psi; LEVEL #3 WASTE AND VENT LINES (1 1/2" - 4"), GL:5 -6/F - G; TESTED AT 100psi.
08/16/2017 PLUMBING - INTERMEDIATE Cancelled
08/11/2017 PLUMBING - INTERMEDIATE Partial Approval LEVE #3, 4" WASTE AND VEN LINES AT GL: B - F/11 - 12.
08/09/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3; BLENDED CHILLED WATER LINES (1/2" - 4") TESTED AT 100psi. GL: 12 - 16/D - F.
08/07/2017 PLUMBING - INTERMEDIATE Cancelled
08/04/2017 PLUMBING - INTERMEDIATE Cancelled
08/02/2017 PLUMBING - INTERMEDIATE Cancelled
08/01/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3; GL: E - H/10 - 12; WASTE AND VENT LINES (1 1/2" - 4")
07/31/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, WASTE AND VENT LINES (1 1/2" -4") GL: D - H/11 - 14.
07/26/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #2; BLENDED CHILLED WATER LINES (1/2" - 4") TESTED AT 100psi: GL: 2 - 9/C - E.
07/25/2017 PLUMBING - INTERMEDIATE Cancelled
07/24/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, DOMESTIC WATER LINES (1/2" - 3") TESTED AT 100psi.
07/21/2017 PLUMBING - INTERMEDIATE Cancelled
07/20/2017 PLUMBING - INTERMEDIATE Cancelled
07/20/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #2, HEATED HOT WATER LINES (3/4" - 2") GL: C - E/2 - 9; F -G/2 - 9; CHILLED BEAM LINES (1" - 2"), GL: F/4 - 9. BLENDED CHILLED WATER LINES (1" - 2") GL: E - G/2 - 9. ALL LINES TESTED AT 100 psi.
07/17/2017 PLUMBING - INTERMEDIATE Partial Approval DOMESTIC HOT AND COLD WATER LINES: (1/2" - 2") AT GL: 2 - 7/A - G. WASTE AND VENT LINES (2" - 4") AT GL: C - G/2 - 7.
07/14/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #2, WASTE AND VENT LINES (2" - 4") GL; C - E/5 -2.
07/13/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #2, WASTE AND VENT LINES (1 1/2" - 4") AT GL: E - F/3 - 6.
07/12/2017 PLUMBING - INTERMEDIATE Cancelled
07/11/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #2, GL: 8/C - F; WASTE AND VENT LINES (2" - 4") ALL UNDER TEST.
07/10/2017 PLUMBING - INTERMEDIATE Cancelled
07/07/2017 PLUMBING - INTERMEDIATE Partial Approval HOT HEATED WATER AND BLENDED WATER LINES: BLENDED LINES 1/2" - 6"; HEATED HOT: 3/4" - 3". ALL LINES UNDER TEST AT 100 psi. GL; 9/F-D; D/8-9.
07/05/2017 PLUMBING - INTERMEDIATE Cancelled
06/30/2017 PLUMBING - INTERMEDIATE Cancelled
06/29/2017 PLUMBING - INTERMEDIATE Cancelled
06/28/2017 PLUMBING - INTERMEDIATE Cancelled
06/23/2017 PLUMBING - INTERMEDIATE Cancelled
06/23/2017 PLUMBING - INTERMEDIATE Not ready for Inspection DOMESTIC WATER LINES: LEVEL 5, TOWER 5: AIR TEST REVEALED LEAKS IN LINES. RECALL FOR 26 JUNE INSPECTION.
06/22/2017 PLUMBING - INTERMEDIATE Cancelled
06/21/2017 PLUMBING - INTERMEDIATE Cancelled
06/21/2017 PLUMBING - INTERMEDIATE Cancelled
06/20/2017 PLUMBING - INTERMEDIATE Cancelled
06/19/2017 PLUMBING - INTERMEDIATE Partial Approval DOMESTIC WATER LINES (1/2" - 2 1/2" ) IN AREA GL: C - G/ 7 - 14. LINES TESTED AT 120psi.
06/16/2017 PLUMBING - INTERMEDIATE Cancelled
06/15/2017 PLUMBING - INTERMEDIATE Cancelled
06/13/2017 PLUMBING - INTERMEDIATE Partial Approval 4" BEAM CHILLED LINE AT GL: F - H/9 - 12. HOT HEAT SUPPLY AND RETURN LINES 2" (2) AT GL: F - H/9 - 12, TESTED AT 101psi. BEAM CHILLED LINES TESTED AT 101psi.
06/12/2017 PLUMBING - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE.
06/09/2017 PLUMBING - INTERMEDIATE Partial Approval HYDRONIC LINES; 3" WASTE LINES IN SHAFT #3 AT LEVEL #3,
06/08/2017 PLUMBING - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
06/07/2017 PLUMBING - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
06/06/2017 PLUMBING - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
06/01/2017 PLUMBING - INTERMEDIATE Not ready for Inspection RESCHEDULED FOR 2 JUNE
05/31/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #2: BEAM CHILLED WATER LINES AT GL: D - F/9 - 13 (1/2: - 3" LINES). HEATED HOT WATER LINES (SOUTH - 3/4" - 2" LINES) GL: 12 - 19/F - H; BLENDED WATER (SOUTH - 1/2" - 4" LINES); HEATING HOT WATER LINES (NORTH - 3/4" - 2").
05/30/2017 PLUMBING - INTERMEDIATE Partial Approval HEATER HOT WATER TESTED AT 102 psi; GL: B - F/12 - 19 (3/4" - 2" LINES). BEAM CHILLED WATER LINES TESTED AT 101psi, GL: B - F/12 - 19, (1/2" - 3" LINES)
05/24/2017 PLUMBING - INTERMEDIATE Partial Approval CHILLED BEAM WATER, SUPPLY AND RETURN AT GL: D - F/12 - 16.
05/23/2017 PLUMBING - INTERMEDIATE Partial Approval LEVELS #2 - ROOF LEVEL; 4" WASTE LINE AT GL: F/7.
05/22/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #1, CAFE AREA, DOMESTIC WATER LINES AT 1/2" - 2" LINES; TESTED AT 130psi. LEVEL #2, WASTE LINES (2" - 4") AT GL: E/8; VENT LINES (2" - 4") AT GL: F - H/9 - 10.
05/19/2017 PLUMBING - INTERMEDIATE Partial Approval BEAM CHILLED WATER (SUPPLY AND RETURN) 1/2" - 6". GL: F/2 - 10. NORTH SIDE. TESTED AT 100psi. DOMESTIC WATER LINES; AREA "B", RISERS AT LEVELS 1 - 3. HOT WATER RETURN AT LEVEL #3 - AREA "B".
05/18/2017 PLUMBING - INTERMEDIATE Partial Approval LEVL #1, WASTE AND VENT LINES (2" - 4") AT GL: E - H - 10 - 11.
05/17/2017 PLUMBING - INTERMEDIATE Partial Approval CHILLED WATER LINES (1 1/2" - 4") AT GL: E - F/7 - 10, TESTED AT 100psi.
05/16/2017 PLUMBING - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
05/15/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES (2" - 4"), GL: E - F/12 - 13.
05/12/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #1; DOMESTIC WATER LINES - TESTED AT 131 psi; GL; C - G/1 - 7; LEVEL #2 LINES TESTED AT 130 psi; GL: C - G/15 - 19.
05/11/2017 PLUMBING - INTERMEDIATE Partial Approval DOMESTIC HOT WATER LINES (3/4" - 2 1/2") RETURN LINES TESTED AT 150 psi.. WASTE AND VENT LINES (2" - 4") AT GL: D - F/16 - 16.5. DOMESTIC HOT WATER LINES AT GL: 10/D - F, F/2 - 10.
05/10/2017 PLUMBING - INTERMEDIATE Not ready for Inspection
05/09/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES AT GL: 13/D - E (2" - 4"); E/14 - 16 (2" - 4"); F/15 (1" - 3").
05/04/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES (2" - 4"). AREA C - C.1; GL DH/17 - 19 (SOUTH)
05/02/2017 PLUMBING - INTERMEDIATE Partial Approval DOMESTIC WATER LINES TESTED AT 129 psi: GL: C - F/7 - 14.
04/21/2017 PLUMBING - INTERMEDIATE Partial Approval HOT WATER LINES (3/4" - 2") AT GL: F/2 - F/8. TESTED AT 102 psi. OK TO INSULATE.
04/20/2017 PLUMBING - INTERMEDIATE Partial Approval CHILLED WATER LINES (SUPPLY AND RETURN) AT 3/4" - 3"; GL F/2 - 8 (SOUTH); BEAM CHILLED WATER LINES (SUPPLY AND RETURN) 1/2" - 3" LINES AT GL: F/2 - 8 SOUTH
04/19/2017 PLUMBING - INTERMEDIATE Partial Approval BEAM CHILLED WATER LINES(1/2" - 3" LINES) CARBON STEEL LINES TESTED AT 98 psi - GL: F/9- 12. OK TO INSULATE.
04/18/2017 PLUMBING - INTERMEDIATE Partial Approval CHILLED WATER LINES AT GL: F/9 - 12, LEVEL #1, TESTED AT 100 PSI (SOUTH PORTION). DOMESTIC WATER LINES (SOUTH) AREA "B", LEVEL #1 TESTED AT 134 psi; LEVEL #2, LINES TESTED AT 136 psi. OK TO INSULATE PROGRESS AREAS.
04/13/2017 PLUMBING - INTERMEDIATE Partial Approval ROOF DRAIN (PRIMARY DRAIN) AT GL: D - F/4. LEVELS: ROOF TO LEVEL #2.
04/12/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES (2" - 3") AT GL: C.5/7.5; D/8
04/12/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES *2" - 4") AT GL: C - G/2 - 5
04/10/2017 PLUMBING - INTERMEDIATE Partial Approval HYDRONIC HOT WATER LINES AT GL: D/8 - 12 (NORTH), TESTED AT 100 PSI. WASTE AND VENT LINES AT LEVELS 1 AND 2 AT GL: D/5 - 7; E/6 - 7; F/4 - 6; G/6 (2" - 3" - 4")
04/06/2017 PLUMBING - INTERMEDIATE Partial Approval CHILLED WATER LINES (2 1/2") AT GL: D/8 - 12. TESTED AT 100 PSI.
04/05/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES (2" - 3") AT GL: F/10, LEVEL #2
04/04/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES (2" - 4") LEVELS 1 AND 2 AT GL: E/6, E/7; E.5/7; E/8; F/8. HYDRONIC PIPING (3/4" - 2 1/2") GL; H/12 - 20 SOUTH. D/8 - 10 NORTH; ALL SYSTEMS ARE TESTED AT 101psi.
03/28/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #1 GL: D - F/12 - 20; BLENDED HYDRONIC COPPER LINES ( 3/4" - 2 1/2"). WASTE AND VENT LINES (2 1/2" - 4") LINES AT LEVELS 1 AND 2: GL: G - H/10 - 12.
03/27/2017 PLUMBING - INTERMEDIATE Partial Approval ROOF DRAINS - 2 PRIMARY DRAINS AT LEVELS: 1, 2, 3 AT GL: E/14, H/14. WASTE AND VENT LINES (2 1/2" - 6") TESTED AT GL: E - F/12; 13/E - H; 14/H; 11/E - F; F/10 - 11 ON LEVEL #2.
03/22/2017 PLUMBING - INTERMEDIATE Partial Approval HYDRONIC CHILLED WATER LINES AT GL: E/12 - 20; TESTED AT 92 PSI (NORTH SIDE).
03/20/2017 PLUMBING - INTERMEDIATE Partial Approval LEVEL #2, TEMPORARY RESTROOM WATER LINES AT 1/2" - 2", TESTED AT 132 PSI.
03/09/2017 PLUMBING - INTERMEDIATE Partial Approval HOT WATER RETURN LINES AT GL: D/12 - 20. OK TO INSULATE.
02/12/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES (2 1/2" - 4") GL: E/11, E/17.
02/08/2017 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES (2" - 4") AREA "C" GL: F/18 - 20. DOMESTIC WATER LINES (1/2" - 2 1/2") AREA "C" GL: D - H/14 - 20
12/30/2016 PLUMBING - INTERMEDIATE Partial Approval VAULT #1 - 2" WASTE LINE AT GL: C.5 - D.5/ 1.5 - 1.8; VAULT #2 2" WASTE LINE AT GL: A.3 - B.8/1.5 - 1.8; VAULT #3 - 2" WASTE LINE AT GL: A.3 - B.9/2.5 - 3.1
12/28/2016 PLUMBING - INTERMEDIATE Partial Approval 2" PVC WASTE VENT AT GL: 1.5 -1.8/D.8 - E.7