Permit: T16CM03514

Parcel: 11202003D

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
04/11/2019 PLUMBING - ROUGH, SOIL Approved
06/23/2017 PLUMBING - ROUGH, SOIL Not ready for Inspection
06/23/2017 PLUMBING - ROUGH, SOIL Partial Approval CHILLED WATER LINE (12" PRIMARY LINE) AT GL: 14/I - K TESTED AT 164 psi. OK TO COVER PROGRESS AREA.
01/05/2017 PLUMBING - ROUGH, SOIL Partial Approval 4" DOMESTIC WATER LINE AT GL: H/9; UNDER TEST AT 100 PSI - OK TO COVER.
12/14/2016 PLUMBING - ROUGH, SOIL Partial Approval 4" DOMESTIC WATER LINE AT GL: G.2/6.25 - 7.25. OK TO COVER PROGRESS AREA.
12/06/2016 PLUMBING - ROUGH, SOIL Partial Approval 3" LINE AT GL: C.6/ 1.5 - 1.8 (2" T's RUNNING NORTH AND SOUTH AT GL: 1.75/ C - C.6) OK TO COVER PROGRESS AEAS.
11/03/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
10/31/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
10/30/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
10/25/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
10/19/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
10/19/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
10/17/2016 PLUMBING - ROUGH, SOIL Partial Approval STORM DRAIN TIE-IN (6" TO 8") AT GL: 9.1/ B.8 - C. OK TO COVER PROGRESS AREA.
10/10/2016 PLUMBING - ROUGH, SOIL Partial Approval 4" WASTE LINES AT GL: D/4 - D/3; 2" LINES AT D.3 - D/ 3.2; D/3 - 2 (3"); D.75/ 3 - 2 (4" - 2"); VENTS AT GL: D.75/2.25 (2" - 2 1/2") C.75 - D/ 2.75 4" LINE; 3.25/C - D 4" LINE; C.5/3 -2 4" WASTE LINE. OK
10/07/2016 PLUMBING - ROUGH, SOIL Partial Approval 6" SANITARY SEWER DRAIN CLEAN OUT AT GL: B.8 - C/6.5
10/06/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
10/04/2016 PLUMBING - ROUGH, SOIL Partial Approval 6" SANITARY SEWER DRAIN AT GL: B.8 - C/6.5. OK TO COVER PROGRESS AREA.
10/03/2016 PLUMBING - ROUGH, SOIL Partial Approval 8" STORM DRAINS AT GL: H/10.5; B - C/6 - 7.5. OK TO COVER PROGRESS AREAS.
10/03/2016 PLUMBING - ROUGH, SOIL Partial Approval STORM DRAIN (8") AT GL: H/9.5; STORM DRAI (8") AT GL: H/13.5; SEWER LINE (8") AT GL: C - C.8/12.5 - 13. OK TO COVER PROGRESS AREAS.
09/30/2016 PLUMBING - ROUGH, SOIL Partial Approval 8" STORM DRAIN DIE-IN AT GL: C/6.5; 4" - 2 1/2" WASTE AND VENT LINES AT GL: D.5 - E/ 4 - 5, D - F/4 - 4.5; 4 - 3.75/E - F.5; E/3.75 - 2.5. OK TO COVER PROGRESS AREAS.
09/26/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
09/26/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection
09/22/2016 PLUMBING - ROUGH, SOIL Partial Approval WASTE AND VENT LINES AT GL: 8/C.25 (8"), C - F.25/ 6.5 (6"); D/6 (2 1/2"), E/6 - 5 (6"); D.5/ 6 - 5 (6"); E.5 - F/6.5 - 7 (4" - 2 1/2"); D.25 - F/ 5.5 - 6 (4"); E/5 - 6 (3"); 6/D.75 - E (4"); D.25/ 5.5 - 4.25 (4"); 5.25/C.75 - D.25 (3"). OK TO COVER PRGRESS AREAS.
09/19/2016 PLUMBING - ROUGH, SOIL Partial Approval 8" STORM DRAINS AT GL: C - D.25/7.5; D.25 - 6.25. OK TO COVER PROGRESS AREAS.
09/15/2016 PLUMBING - ROUGH, SOIL Partial Approval 4" - 3" - 2.5" WASTE AND VENT LINES AT GL: 9.5 - 11.5/ G- G.8; E - G.5/ 10.5 - 9. OK TO COVER PROGRESS AREAS.
09/15/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection INFORMATION ONLY.
09/13/2016 PLUMBING - ROUGH, SOIL Partial Approval 4" WATER LINE AT GL: G/9 TESTED AT 130 psi; 4" STORM DRAIN AT GL: H/9; 2" WASTE LINES AT GL: E.25 - E.75/ 7 - 8; E.75 - F/ 7.5 - 8; 4" WASTE LINE AT GL: E.5/ 7 - 7.8. OK TO COVER PROGRESS AREAS.
09/09/2016 PLUMBING - ROUGH, SOIL Partial Approval WASTE LINES AND VENTS AT GL: F.8 - H/10 - 11. OK TO COVER PROGRESS AREAS.
09/07/2016 PLUMBING - ROUGH, SOIL Cancelled
09/06/2016 PLUMBING - ROUGH, SOIL Partial Approval WASTE (7.8 TO 8.5 / C.2 TO D) AND (8.4 TO 10.2 / C.2 TO D)
GREASE LINE (8.4 TO 10.2 / C.2) ALL TESTED AND OK TO COVER.
09/01/2016 PLUMBING - ROUGH, SOIL Partial Approval SECTION B-2; WASTE LINES AND RISERS AT GL: 9 - 8/D.9 - E.5. OK TO COVER PROGRESS AREAS.
08/30/2016 PLUMBING - ROUGH, SOIL Partial Approval 8" STORM DRAIN AT GL: G.3/10.5. OK TO COVER PROGRRESS AREA.
08/26/2016 PLUMBING - ROUGH, SOIL Partial Approval 2" - 6" WASTE LINES AND RISERS AT GL: D - G.8/ 11 - 14. OK TO COVER PROGRESS AREAS.
08/25/2016 PLUMBING - ROUGH, SOIL Partial Approval 8" STORM DRAIN AT GL: G.5/13.5. OK TO COVER PROGRESS AREA.
08/22/2016 PLUMBING - ROUGH, SOIL Not ready for Inspection NOT READY
08/19/2016 PLUMBING - ROUGH, SOIL Partial Approval WASTE AND VENT LINES AT 2.5" - 6" LINES. GL: D.5 - H/14 - 17. OK TO COVER PROGRESS AREAS.
08/12/2016 PLUMBING - ROUGH, SOIL Partial Approval 2 1/2 " LINE AT GL: 19-F - H; OK TO COVER PROGRESS AREA.
08/08/2016 PLUMBING - ROUGH, SOIL Partial Approval WASTE AND VENT LINES; 8" ROOF DRAIN AT 4' WESTOF COLUMN 17' 5' FROM COLUMN LINE #20; F.5 - H. OK TO COVER PROGRESS AREAS.
08/05/2016 PLUMBING - ROUGH, SOIL Partial Approval 4" WASTE LINE AT GL: 17/E - F, 8" ROOF DRAIN AT E/19 - 20; CLEAN OUTS AND VENT LINES AI AREA OF E/19 - 20.