Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T16CM03514

Parcel: 11202003D

Inspection Status: Approved

Inspection History: ELECTRIC - INTERMEDIATE

Permit Number - T16CM03514

Inspection Description - ELECTRIC - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
04/11/2019 ELECTRIC - INTERMEDIATE Approved
09/26/2018 ELECTRIC - INTERMEDIATE Partial Approval MRI-3T, Rooms # 1A117, 1A118. Ok to cover walls
09/21/2018 ELECTRIC - INTERMEDIATE Partial Approval PET-CT ROOMS #140 through #145.
01/10/2018 ELECTRIC - INTERMEDIATE Not ready for Inspection FRAMING STUD NEEDS TO BE MOVED (HCR #3) AWAY FROM ELECTRIC CONDUIT TO ALLOW FOR PROPER INSTALLATION OF SHEETROCK.
12/07/2017 ELECTRIC - INTERMEDIATE Partial Approval SPOT CHECKED GFCI OUTLETS ON LEVELS #1, 2, 3. NO PROBLEMS WERE FOUND.
12/06/2017 ELECTRIC - INTERMEDIATE Partial Approval OVER HEAD LIGHTING IN LINAX #1 AND LINAX #2.
11/17/2017 ELECTRIC - INTERMEDIATE Partial Approval LINAC #3, CONTROL ROOM #AB217 - ELECTRIC IN WALLS. OK TO COVER WALLS.
11/13/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS IN LINAC #3, OK TO COVER WALLS.
11/06/2017 ELECTRIC - INTERMEDIATE Partial Approval LINAC #2, LINAC CORRIDOR, CONTROL ROOMS #1B237, 1B232; CAMERA ROOMS #1A136, 1A137 (SOUTH AND WEST WALLS); IN WALL ELECTRICITY.
10/26/2017 ELECTRIC - INTERMEDIATE Partial Approval IN WALL ELECTRIC AT LINAC #1. OK TO COVER WALLS.
10/10/2017 ELECTRIC - INTERMEDIATE Partial Approval E;ECTRIC PANELS: LEVEL #1: LPW1A, 1B, 1C; LEVEL #2: LPE2A, 2B, 2C; LEVEL #3 LPE3C. OK TO ENERGIZE PANELS.
09/26/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC PANELS #HMP-1, HMP-2, HMP-3, LE -3. OK TO ENERGIZE PANCELS.
09/25/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC PANELS #LMW1, LMW2, LMW3. OK TO ENERGIZED PANELS.
09/22/2017 ELECTRIC - INTERMEDIATE Cancelled
09/05/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #1, PANEL #LME-1; LEVEL #2, PANEL #2, LME-2. OK TO ENERGIZE PANEL LME-1. LEM-2 TO BE ENERGIZED AT A LATER DATE.
08/25/2017 ELECTRIC - INTERMEDIATE Cancelled
08/24/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2, PANEL HLE -2; OK TO ENERGIZE PANEL FRO LEVELS #1 & 2; LOCK OUT, TAG OUT MUST BE USED IN THIS PANEL.
08/22/2017 ELECTRIC - INTERMEDIATE Partial Approval LIGHT POLE CAISSONS: ALLEN ROAD (4), PARKING STRUCTURE (2). OK TO PLACE CONCRETE.
08/21/2017 ELECTRIC - INTERMEDIATE Cancelled
08/17/2017 ELECTRIC - INTERMEDIATE Partial Approval UTILITY PLANT, ELECTRIC PANEL #PCP- MSD-1 AT 1200 AMPS. OK TO ENERGIZE.
08/16/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #3, ELECTRIC IN WALLS: GL: C - H/7 - 12. OK TO COVER WALLS.
08/11/2017 ELECTRIC - INTERMEDIATE Partial Approval
08/11/2017 ELECTRIC - INTERMEDIATE Cancelled
08/07/2017 ELECTRIC - INTERMEDIATE Cancelled
08/03/2017 ELECTRIC - INTERMEDIATE Cancelled
08/02/2017 ELECTRIC - INTERMEDIATE Cancelled
08/01/2017 ELECTRIC - INTERMEDIATE Cancelled
07/31/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS AT GL: D - H/12 - 14.5 ON LEVEL #3.
07/26/2017 ELECTRIC - INTERMEDIATE Cancelled
07/25/2017 ELECTRIC - INTERMEDIATE Cancelled
07/24/2017 ELECTRIC - INTERMEDIATE Cancelled
07/21/2017 ELECTRIC - INTERMEDIATE Cancelled
07/20/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC ROOM #1A218: PANELS: LME-1, HLE-1, LPE-1B, LPE-1A, GDPPE. OK TO ENERGIZE PANELS.
07/18/2017 ELECTRIC - INTERMEDIATE Partial Approval AREAS 11 - 14; GL: 5 - 9/C - G: ELECTRIC IN WALLS, OK TO ON SIDE SHEET ROCK.
07/17/2017 ELECTRIC - INTERMEDIATE Cancelled
07/14/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC UNDERGROUND - SIX CAISSON LIGHT POLE FOOTINGS WITH 3/4" CCONDUIT LINES.
07/13/2017 ELECTRIC - INTERMEDIATE Cancelled
07/12/2017 ELECTRIC - INTERMEDIATE Cancelled
07/12/2017 ELECTRIC - INTERMEDIATE Cancelled
07/11/2017 ELECTRIC - INTERMEDIATE Cancelled
07/10/2017 ELECTRIC - INTERMEDIATE Cancelled
07/07/2017 ELECTRIC - INTERMEDIATE Partial Approval POLE LIGHT CAISSONS; 6 @ PARKING SRUCTURE; 3 @ ALLEN CENTER. OK TO POUR CAISSON FOOTINGS.
07/05/2017 ELECTRIC - INTERMEDIATE Cancelled
06/29/2017 ELECTRIC - INTERMEDIATE Cancelled
06/23/2017 ELECTRIC - INTERMEDIATE Cancelled
06/22/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC IN WALLS IN ROOMS AT GL: D - G/8 - 10
06/20/2017 ELECTRIC - INTERMEDIATE Cancelled
06/19/2017 ELECTRIC - INTERMEDIATE Cancelled WORK INCOMPLETE.
06/16/2017 ELECTRIC - INTERMEDIATE Cancelled
06/15/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL 3 ELEVATOR 1,2,3,4 CONTROL PANELS OK.
06/14/2017 ELECTRIC - INTERMEDIATE Cancelled
06/13/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE.
06/12/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2: GL: D - H/10 - 12. OK TO COVER WALLS.
06/09/2017 ELECTRIC - INTERMEDIATE Partial Approval UNDERGROUND CONDUITS AT NORTH OF TRASH ENCLOSURE: 2 @ 3/4" CONDUITS. OK TO COVER PROGRESS AREA.
06/08/2017 ELECTRIC - INTERMEDIATE Partial Approval DISCONNECTS FOR AIR HANDLERS #1 & #2.
06/07/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
06/06/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
06/02/2017 ELECTRIC - INTERMEDIATE Partial Approval PARTIAL. INFORMATION. ROOD LEVEL: LOCATION OF FEEDER LINES TO AIR HANDLERS # 1 & #2.
06/01/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection RESCHEDULED FOR 2 JUNE
05/31/2017 ELECTRIC - INTERMEDIATE Partial Approval EMERGENCY GENERATOR; TRANSFER SWITCHES: DP-HELV; APS-ELV ON LEVEL #1. LEVEL #2, PANEL MDPE3.
05/30/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
05/29/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
05/25/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
05/24/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE.
05/23/2017 ELECTRIC - INTERMEDIATE Partial Approval LEVEL #2, ROOMS IN AREA AT GL: E - H/12 - 15.
05/22/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE.
05/19/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE.
05/18/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
05/17/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
05/16/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection WORK INCOMPLETE
05/15/2017 ELECTRIC - INTERMEDIATE Partial Approval ELECTRIC ROOM #10185, SES UNITS #1 AND #2; MSB #1 AND MSB #2. OK TO ENERGISE UNITS.
05/12/2017 ELECTRIC - INTERMEDIATE Partial Approval AREAS #1 - 4, LEVEL #2; GL: C - G/15 - 19
05/11/2017 ELECTRIC - INTERMEDIATE Partial Approval BOXES AND SWITCHES IN ROOMS AT GL: C - G/4 - 7. OK TO INSULATE AND COVER WALLS.
05/10/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection
05/09/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection
05/08/2017 ELECTRIC - INTERMEDIATE Partial Approval X-FORMER IN GARAGE FIRST FLOOR OK TO CLOSE.
05/05/2017 ELECTRIC - INTERMEDIATE Cancelled
05/04/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection
05/03/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection
05/02/2017 ELECTRIC - INTERMEDIATE Not ready for Inspection NOT READY
04/28/2017 ELECTRIC - INTERMEDIATE Partial Approval AREAS 3, 4, 5, 6.
04/21/2017 ELECTRIC - INTERMEDIATE Partial Approval IFORMATION ONLY: RE: ADDITIONAL LUGS FOR SES CABINET.
03/14/2017 ELECTRIC - INTERMEDIATE Partial Approval PRELIMINARY WALK THROUGH: SWITHCH BOXES, OUTLET BOXES, FIRER ALARM BOXES, DATA BOXES, LOW VOLTAGE BOXES IN AREAS AT GL: F/8 - 20; D - H/8 - 20. ALL AREAS TO BE RECHECKED WHEN NEEDED MATERIALS ARRIVE.
01/19/2017 ELECTRIC - INTERMEDIATE Partial Approval 4" CONDUITS INTO EACH VAULT (4 CONDUITS PER VAULT, 4 VAULTS