Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/21/2016 |
ENGINEERING - FINAL |
|
Approved |
|
| 10/04/2016 |
ENGINEERING - FINAL |
|
Correction Required |
CONTACTED THE CONTRACTOR BUILDING EXCELLENCE L.L.C. AND ASKED THAT THEY ARRANGE A MEETING WITH THE E.O.R. TO DISCUSS THE FINAL REQUIREMENTS TO ALLOW FOR THE FINAL INSPECTION OF THE SITE. THEY WILL ADVISE ME IF WE WILL BE ABLE TO MEET OUT ON SITE TOMORROW. |
| 09/27/2016 |
ENGINEERING - FINAL |
|
Correction Required |
MET THE CONTRACTOR AND RON ON SITE AT AROUND 11:30 TOO LOOK OVER THE WORK THAT HAS BEEN DONE ON THE WHEELCHAIR ACCESS RAMP AND THE PARKING SPACES. THE PARKING SPACE AND THE OFF LOAD AREA DOES NOT MEET THE 2% SLOPES AND WILL NEED TO BE REWORKED. ALSO THE 60 INCH CHANGE OF DIRECTION AREAS WILL NEED TO BE ADDRESSED SO THAT THEY STAY WITHIN COMPLIANCE PER THE CODE. CURRENTLY THE HANDRAIL ENCROACH INTO THE SPACE BY 6 INCHES, THE MAXIMUM FOR THIS IS ONLY 4 1/2 INCHES. I TOLD THE CONTRACTOR THAT I WILL VERIFY WITH CLAYTON IF THIS IS ACCEPTABLE THROUGH HIS INTERPULATION OF THE CODE. MET WITH CLAYTON AND DISCUSSED THE SITE AND HE AGREES THAT THE HANDRAILS CAN ONLY STICK IN 4 1/2 INCHES INTO THIS CHANGE OF DIRECTION AREA. I WILL ADVISE THE CONTRACTOR TOMORROW. |
| 09/26/2016 |
ENGINEERING - FINAL |
|
Continued |
CONTRACTOR NOT ON SITE, LEFT MESSAGE, CALL FOR RE-INSPECTION |
| 08/25/2016 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
INSTALL ADA RAMP PER CODE AND ADA PARKING AREA. |