Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/15/2017 |
ENGINEERING - FINAL |
|
Approved |
|
| 03/01/2017 |
ENGINEERING - FINAL |
|
Partial Approval |
OK FOR THE TEMPORARY CERTIFICATE OF OCCUPANCY COMPLETE ALL THE WORK SHOWN ON THE APPROVED PRIOR TO CALLING FOR THE FINAL INSPECTION OF THE SITE. CURRENTLY THE INTERIOR OF THE SITE IS APPROXIMATELY AT 80% AND NEEDS TO BE COMPLETED MORE PRIOR TO REQUESTING THE C OF O. THIS WILL ALSO INCLUDE THEWORK ON THE PATIO AREA LOCATED AT THE SOUTH END OF THIS STRUCTURE. |
| 10/27/2016 |
ENGINEERING - FINAL |
|
Continued |
MET WITH GC ABOUT RAMPS AND RAILING. |