Inspection Status: Approved
Inspection History: BUILDING - PROGRESS
| Date |
Description |
Inspector |
Results |
Comments |
| 12/26/2017 |
BUILDING - PROGRESS |
|
Approved |
|
| 10/27/2016 |
BUILDING - PROGRESS |
|
Partial Approval |
PLUMBING UNDERGROUND: STORM DRAIN LINES AT GL: AW - CW/ 2.5 - 3.5. OK TO COVER PROGRESS AREA. |
| 10/17/2016 |
BUILDING - PROGRESS |
|
Partial Approval |
ELECTRIC UNDERGROUND; AT GL: BW.2- CW/ 1; APPROXIMATELY 75' WITH 2 EACH 4" CONDUITS, 3 EACH 1 1/2" CONDUITS; BW.5/ 1 - 2 APPROXIMATELY 50' WITH 2 EACH 4" CONDUITS, 3 EACH 1 1/2" CONDUITS. OK TO COVER PROGRESS AREAS. |
| 10/11/2016 |
BUILDING - PROGRESS |
|
Partial Approval |
ELECTRIC UNDERGROUND IN PARKING STRUCTURE; 2 EACH4" CONDUIT LINES FROM MS/N; 2 EACH4" LINES AT DP-HIA; 1 EACH 3" LINE AT EHD/n/N. PANEL HLF1A1 - DISCONNECT; TRANSFORMER T2A1 (1 1/2" CONDUIT. OK TO COVER PROGRESS AREAS. |