Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T16CM02493
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/26/2017 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
10/10/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PILASTER FOOTINGS AT GL; 7/ D.1; 7.5/ D.1; 9/D.2. OK TO POUR PROGRESS AREAS. | |
10/07/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ELEVATOR FOOTING, COLUMN FOOTINGS, PEDISTALS AT GL: CE - CE.9/7; DE.5 / 7 - 7.8. OK TO PLACE CONCRETE. | |
10/06/2016 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | ||
10/06/2016 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | ||
10/04/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PEDISTAL AND COLUMN FOOTINGS AT GL: DE/8; A/7.9 (D.6); CE.9/7.5. OK TO PLACE CONCRETE IN PROGRESS AREAS. | |
09/26/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS (F2); WALL FOOTING (SW4 - WF8) GL: CE/10 - 17. OK TO PLACE CONCRETE | |
09/22/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | SHEAR WALL FOOTING (SW3 - SF7) AT GL: 18/ BE.75 - CE.25. OK TO PLACE CONCRETE. | |
09/21/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTING @ GL: AE/8 - 9 (F4); SHEAR WALL FOOTING (SW3 - WF3) @ GL: 18/AE.75 - BE.25. OK TO PLACE PROGRESS AREAS. | |
09/21/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS AT GL: E/15, 16, 18 (F4"S), #17 (F3). OK TO PLACE CONCRETE | |
09/19/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS AT GL: BE/17 (F2), 11/BE (F2); WALL FOOLTING AT GL: BE/11 - 17 (WF4) AT GL: BE/11 - 17; OK TO PLACE CONCRETE. | |
09/15/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS AT GL: AE/16 - 17 (F3 - F4). DE/ 13 - 16 (F4); SHEAR WALL FOOTING AT GL: CE/ 8 - 9. OK TO PLACE CONCRETE AT PROGRESS AREAS. | |
09/15/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS AT GL: DE/ 13 - 16. OK TO PLACE CONCRETE AT PROGRESS AREAS. | |
09/12/2016 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | WILL RECALL FOR 14 SEPTEMBER 2016 | |
09/09/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS AT GL: AE/11, 12, 13, 14, 16; SHEAR WALL FOOTING AT GL: BW/8 - 9. NOTE: COLUMN FOOTING AT GL: AE/15 WAS TOO WET TO POUR AT THE TIME OF THIS INSPECTION; WILL NEED TO DRY-OUT. OK TO POUR PROGRESS AREAS. |
|
09/01/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | WF5 FOOTING AT GL: DW/1; CW.9/1. OK TO POUR PROGRESS AREAS. | |
08/31/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 5 EACH COLUMN FOOTINGS AT GL: DW/2 (F3), DW/ 3, 4, 5, 6 (F4); SHEAR WALL AT GL: CW/ 3 - 4 | |
08/30/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS AT GL: 5/1; 6/A; 7/A; (F4); GL: 5/B; 6/B, C (F2); SHEAR WALL FOOTINGS AT GL: B/3 - 4. OK TO PLACE CONCRETE. | |
08/26/2016 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | CONTRACTOR CANCELLED | |
08/25/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS CW/2 (F1), CW/5 (F2)..COLUMNS POURED. | |
08/24/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CONTINUOUS FOOTINGS AT GL: AW/1 - 1.25; 1/AW.8 - BW.5. OK TO POUR PROGRESS AREAS. | |
08/19/2016 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | COLUMN FOOTINGS AT GL: 2/ AW(F3); 3/AW (F4); 4/AW (F4); 2BW (F1). OK TO POUR PROGRESS AREAS. |