Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2017 | PLUMBING - INTERMEDIATE | Approved | ||
| 03/06/2017 | PLUMBING - INTERMEDIATE | Partial Approval | 1- DWV WATER TEST PROVIDED. 2- DOMESTIC WATER DISTRIBUTION IN WALLS ARE OKAY. |
|
| 01/25/2017 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1- THE REVISED RE LOCATION OF THE BDLG. DRAINS TO THE FLOOR SINKS AND HAND SINK ARE OKAY TO BACKFILL. 2- NOTE: SHALL PROVIDE RED LINE DRAWINGS SHOWING THE RE LOCATION OF SCPECIFIED BLDG. DRAINS PROIR TO THE FINAL INSPECTION. |