Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2016 | ENGINEERING - FINAL | Approved | ||
| 07/20/2016 | ENGINEERING - FINAL | Denied | 1) PROVIDE HC PARKING: PARK LOAD/UNLOAD GET IN AND OUT 2) ROUTE WATER FROM MAIN ROOF DRAINS AWAY FROM BLDG AND SIDWALKS CALL FOR RE-INSPECTION |