Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T15CM01103
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2015 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
07/31/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
07/30/2015 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
07/29/2015 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
07/22/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | PROVIDE DOCUMENTATION TO USE PVC CONTRARY TO PLAN SPEC. PROVIDE TEST ON THROUGH | |
07/21/2015 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
07/20/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | TRENCH DRAIN AT GL; C-D; 2" FLOOR CLEAN OUTS | |
07/16/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | 4" SEWER LINE FROM CLEAN OUT: APPROX 56' SEE MOTES 10,11 ON DP #5 OK TO COVER | |
07/15/2015 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | NOT READY- CONTRACTOR CANCELLED | |
07/14/2015 | PLUMBING - ROUGH, SOIL | Denied | IMPORPOR USE OF COMBO AND VENT CONNECTION. | |
07/09/2015 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
07/06/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | FROM BLDG TO INTERCEPTOR OK VENT PIPING FROM 11 TO BLDG OK REDLINE LOCATION. PIPING BELOW ROUGHIN OK SLEEVES OK INTERCEPTOR CONNECTIONS REQUIRE TEST |
|
07/01/2015 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |