Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
Permit Number - T15BU00951
Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/27/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | 200 psi for 2 hours This 4" C-900 underground piping was installed in the ground for potential use in the future as a cost savings. Still needs to be flushed after piping is connected to the city water main. Thrust blocks in tracer wire in place and all metal fittings cover with plastic wrap, 45 deg was added to keep piping away from handicap ramp area on the east end. |