Inspection History Details
Inspection Status: Partial Approval
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2015 | FIRE - ALARM FINAL | Partial Approval | This job is broken up into 2 phases: Phase 1 is the kitchen area storage room and outside bathrooms Partial Approval given - OKAY to use the kitchen -Phase #1 approved The following was completed and passed for Phase #1: 1. Duct smokes 2. Smoke above NAC panel 3. Pull stations 4. Horns and strobes 5. Dated batteries in NAC 6. NAC electrical panel labeled The following will need to be done before phase #2 final will be given: 1. Need lock out installed on breaker for the alarm NAC 2. Need lock out installed on breaker for the fire Bell |