Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T14DV02111
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | RECEIVED CIVIL MOTION TO DISMISS CASE AGAINST TALAZERA HOLDING GROUP LLC. EMAIL MOTION TO BOTH PRIOR AND CURRENT OWNERS.. CLOSE CASE | |
| 12/07/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | THE PROPERTY IS UNDER NEW OWNER SHIP. THERE CREWS ONSITE CLEANING, THERE ARE SECURITY GATES AND CAMERAS ON THE PROPERTY, THE PARK IS VACANT. OWNER STATED IN TWO WEEKS HE WILL HAVE THE PERIMETRS FENCE COMPLETED AND CONTINUE THE WORK. SUPERVISION OK TO DIMISS CURRENT CASE AGAINST TALAZERA HOLDING GROUP LLC |
|
| 09/13/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | ISSUED JUTICE WEB CIVIL CITATION.. | |
| 09/12/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | ONSITE TO TAKE ADDITIONAL PHOTOS | |
| 09/05/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT T15CM01601 FOR ELECTRICAL REPAIRS FOR 15 UNIT MH PARK -PER CASE T14DV02111; HAS EXPIRED,, UNITS 3, 7, 13 ARE CURRENTLY OCCUPIED,, THE FOLLOWING MOBILE HOMES HAVE BEEN BOARDED TO PREVENT ENTRY. ON 7-31-2017 UNITS: 4,9,10,11,12,14 AND 15 WERE CONDEMNED, UNSAFE TO OCCUPY. THE BUILDING UNIT NUMBER 2 HAS A LARGE TREE BRANCH RESTING ON THE ROOF WHICH DAMAGED THE BUILDING THIS UNIT WAS ALSO CONDEMNED. ALL ABOVE UNITS ARE DILAPIDATED. THE GROUND HAVE LARGE AMOUNTS OF TRASH AND DEBRIS, THERE ARE TWO AREAS IN THE PARK WHICH HAVE BURNING RESIDUE DUE TO OPEN FIRES. SPACES 5, 6 AND 8 ARE CURRENTLY VACANT NO MOBILE HOME ONSITE. THIS PROPERTY IN ITS CURRENT STATE CONTINUES TO BE A PUBLIC NUISANCE TO THE COMMUNITY. MET WITH SUPERVISOR ONSIDE, WILL ISSUE CITATION ALL THE ABOVE VIOLATIONS.. | |
| 03/01/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT REACTIVED AND EXPIRES ON 8-23-2017 | |
| 10/25/2016 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT WAS REACTIVATED EXPIRES 01/17/2017 MEETING CONTRACTOR ONSITE |
|
| 10/25/2016 | INSP - FOLLOW UP CODE ENFORCE | Approved | ONISTE MEETING WITH CONTRACTOR, WE WENT OVER PENDING VIOLATIONS AND GAVE MANAGEMENT DIRECTION TO CLEAN THE GROUNDS SUPERVISOR ROMERO ONSITE | |
| 08/10/2016 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT HAS EXPIRED AS OF 7-19-2016 UNABLE TO CONATCT MANAGER CALLED OWNER AND LEFT MESSAGE |
|
| 02/16/2016 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT EXPIRES ON 7-19-2016 | |
| 01/21/2016 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owners represenitive and the electrician. The electrician was not informed of the corrections that needed to be made. We wlaked the project and went over the items. All ground rods on 4-11 side were found. | |
| 10/29/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT WAS REACTIVATED ON 10-26-2015 AND EXPIRES ON 04/25/2016.. 1ST INSPECTION WAS CALL ON 10-28-2015 | |
| 10/28/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | INSPECTION RESULTS: UNIT 4 VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED FITTING ABOVE THE METER SOCKET NOT WEATHER TIGHT UNIT 5 NO TRAILER VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED MAIN BREAKER IS SQUARE D NOT LISTED FOR USE WITH CUTLER HAMMER EQUIPMENT. UNIT 6 NO TRAILER VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED NO ACCESS TO EQUIPMENT DISCONNECT, DUE TO CHAIN LINK FENCE. UNABLE TO CONDUCT FULL INSPECTION UNIT 7 VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED UNIT 8 NO TRAILER VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED MAIN BREAKER IS SQUARE D NOT LISTED FOR USE WITH CUTLER HAMMER EQUIPMENT. RECEPTACLE ENCLOSURE IS LOOSE OVER HEAD CONDUCTORS ARE NOT ABOVE CODE REQUIREMENT OF 10 FEET. UNIT 9 VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED FITTING ABOVE THE METER SOCKET NOT WEATHER TIGHT UNIT 10 VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED. UNIT 11 VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED MISSING HARDWARE UNIT 12 VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED UNUSED OPENINGS LIFE LINE CORD CAP IS IN DETERIORATED CONDITION. UNIT 13 VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED UNUSED OPENINGS UNIT 14 THIS IS A HARD WIRED SYSTEM VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED UNUSED OPENINGS THE NEUTRALS AND GROUNDS ARE NOT SEPARATED. UNIT 15 THERE IS MULTIPLE CONDUCTORS ON THE LINE SIDE LUGS THIS IS SUPPLYING POWER TO 30 AMP EQUIPMENT DISCONNECT. VERIFY BOTH GROUNDING RODS AND CONNECTIONS PERMANENT LABELING REQUIRED UNUSED OPENINGS THE NEUTRALS AND GROUNDS ARE NOT SEPARATED THE METER HAS BROKEN GLASS COVER |
|
| 03/11/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT ISSUED T15CM01601 ELECTRICAL REPAIR FOR 15 UNIT MH PARK - T14DV02111; T14DV08866 PERMIT EXPIRES ON 09-06-2015 |
|
| 03/06/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | ONSITE MEETING WITH NEW MANAGER, SEE NOTES IN CONDTIONS | |
| 03/05/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | SUPERVISOR SALDATE APPROVED EXTENSION, TIME SHALL BE SET TOMORROW AFTER THE MEETING.. | |
| 12/16/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | MET ON SITE WITH CONTRACTOR ANGEL, WE WALKED THE PARK AND I EXPLAINED THAT A PERMIT IS REQUIRED HE SAID HE WILL PULL A PERMIT WITHIN A FEW DAYS | |
| 11/24/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | THE UNIT 5 MOBILE HOME WAS DEMOLISHED AND REMOVED FROM THE PROPERTY. T14DV02311 CASE WAS CLOSED | |
| 09/16/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT FOR SERVICE UPGRADE T14CM02051 FINAL | |
| 08/15/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | THE DEBRIS FROM THE FIRE DAMAGED TRAILER HAS NOT BEEN REMOVED. MET CONTRACTOR ONSITE THIS MORNING, MANAGEMENT COMPANY WAS NOT PRESENT. WE DISCUSSED UNITS 4 THUR 15. REPAIR ALL DEFECTS AND INSTALL A GROUNDING SYSTEM. UNITS 12,13,14 HAS THE OVERHEAD FEEDER WHICH NEEDS TO BE RAISED TO CODE HEIGHT OF 8 FEET OVER THESE UNITS.. |
|
| 07/28/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | NEW SERVICE EQUIPMENT WAS INSTALLED AND ENERGIZED, DSD DID OK THE POWER, NO FINAL INSPECTION HAS BEEN CALLED FOR. NEW EQUIPMENT DISCONNECTS HAVE BEEN INSTALLED ON THE EASTSIDE OF THE PARK. NO PERMIT FOR ANY OF THE UNITS. NO WORK HAS BEEN DONE ON THE WESTSIDE OF THE PARK. |
|
| 06/20/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | NEW SERVICE EQUIPMENT WAS INSTALLED BUT NOT CONNECTED. CONTRACTOR IS WAITING FOR TREE TO BE TRIMMED FOR TEP TO RUN THE FEEDERS. I CHECKED WITH DSD FOR PERMIT T14CM02051 DOES HAVE THE UPGRADE ON IT AND IS OK. | |
| 04/17/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | ALL TRAILERS DISCONNECTING MEANS, FEEDERS AND SUPPORTS SYSTEMS HAVE BEEN INSPECTED. UNIT 4 THE OVER CURRENT PROTECTION IS 50 AMPS AND THE LIFELINE RATING IS 40 AMPS, NO LABELING, NO GROUNDING SYSTEM. UNIT 5 THE FIRE DAMAGE TRAILER. THE ELECTRICAL SYSTEM DISCONNECTING MEANS WAS DESTROYED. T14DV02311 HAS ALL RELATED DATA. UNIT 6 VACANT UNIT NO LABELING, NO GROUNDING SYSTEM. THE SUPPORT SYSTEM IS UNSTABLE UNIT 7 NO LABELING, NO GROUNDING SYSTEM. THE SUPPORT SYSTEM FOOTER IS CRACKED UNIT 8 VACANT SPACE NO DISCONNECTING MEANS UNIT 9 UNABLE TO DETERMINE AMPACITY OF THE OVERCURRENT DEVICE DUE TO WORK CLEARANCE OBSTRUCTION. NO LABELING, NO GROUNDING SYSTEM. THE SUPPORT SYSTEM IS UNSTABLE AND DETERIORATED. UNIT 10 NO LABELING, NO GROUNDING SYSTEM. UNIT 11 WAS A SHUT DOWN DUE TO TAMPERING WITH THE DISCONNECTING MEANS IN BY PASSING THE OVERCURRENT DEVICE AND CONNECTING THE FEEDERS DIRECTLY TO THE 30 AMP RECEPTACLE. THE MAIN BREAKER DID HAVE BURNS AND INTERNAL COMPONENTS HAVE BEEN DAMAGED SUPERVISOR MARTIN ROMERO AUTHORIZED THE SHUT DOWN, INSPECTOR CAMPBELL DID HAVE MANAGEMENT COMPANY SIGN THE ORDER TO VACATE AND POSTED A PLACARD UNFIT TO OCCUPY. TENANTS DID VACATE. NO LABELING, NO GROUNDING SYSTEM. ADVISED MANAGEMENT COMPANY AND THE ELECTRICAL CONTRACTOR ON SITE A PERMIT WILL BE REQUIRED FOR THE REPAIRS. UNIT 12 NO LABELING, NO GROUNDING SYSTEM, THE DISCONNECTING MEANS IS LOOSE, UNIT 13 NO LABELING, NO GROUNDING SYSTEM, UNUSED OPENINGS. UNIT 14 THIS IS A HARD WIRED SYSTEM NO LABELING, NO GROUNDING SYSTEM, UNUSED OPENINGS THE NEUTRALS AND GROUNDS ARE NOT SEPARATED. UNIT 15 THERE IS MULTIPLE CONDUCTORS ON THE LINE SIDE LUGS THIS IS SUPPLYING POWER TO 30 AMP EQUIPMENT DISCONNECT. NO LABELING, NO GROUNDING SYSTEM, UNUSED OPENINGS THE NEUTRALS AND GROUNDS ARE NOT SEPARATED OVERVIEW THE PARKS WOOD POST SUPPORT SYSTEM IS UNABLE TO PROVIDE THE HEIGHT REQUIREMENTS FOR THE OVER HEAD FEEDERS, THESE FEEDERS TRAVEL OVER THE TOPS OF THE ONE HOUSE AND THE FOLLOWING TRAILERS UNIT'S 2, 4,5,6,7,9,10,12,13,14. POSTS HAVE IDENTIFIED TO HAVE SEVERE DAMAGE DUE DETERIORATION CAUSE BY LACK OF MAINTENANCE AND TERMITE DAMAGE. THE CONCRETE FOOTERS HAVE CRACKS AND ARE EXPOSED TO DUE MOVEMENT. THERE ARE POSTS WHICH ARE UNABLE TO SUPPORT ITS OWE WEIGHT SOME POSTS HAVE PIECES OF LUMBER WHICH HAVE BEEN ADDED TO THE TOPS OF THE POSTS TO GAIN HEIGHT FOR THE FEEDERS. THESE FEEDERS ARE BELOW THE 8 FOOT REQUIRED HEIGHT. THE POSTS IN THESE LOCATIONS ARE NOT HIGH ENOUGH FOR THE FEEDERS TO MEET THE CODE HEIGHT. REQUIRED ACTION THE ELECTRICAL DEFECTS AND REPLACEMENT OF THE POSTS WILL REQUIRE A PERMIT. A PLAN FOR AN ELECTRICAL DISTRIBUTION SYSTEM WILL BE REQUIRED. SUPERVISOR TO REVIEW REPORT THEN I WILL MAIL THE NOTICE . |
|
| 04/17/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | SERVICE UPGRADE WAS ADDED TO PERMIT ON THE INSPECTION SCREEN, A REQUIRED INSPECTION.. | |
| 04/11/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT T14CM02051 ISSUED REPLACE OVERHEAD LINES - MH HOMES - T14DV02111 | |
| 04/04/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | THE OVERHEAD FEEDERS WERE ELEVATED. THIS IS TEMP REPAIR. |