Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2015 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 01/23/2015 | MECHANICAL - FINAL | Denied | CUSTOMER CALLED TO SCHEDULE INSPECTION FOR 01-26-15 WANTED TO NOTE THAT CONTRACTOR WILL NOT REMOVE ELECTRICAL TAPE ON CONNECTION BETWEEN ALUMINUM AND COPPER CONDUCTORS BUT STATED THAT SPLIT BOLT CONNECTORS WRAPPED IN RUBBER AND THEN TAPED WITH ELECTRICAL TAPE USED. PAPERWORK IS IN FUSE BOX |
|
| 12/12/2014 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 12/12/2014 | MECHANICAL - FINAL | Denied | - TAMPER-PROOF CAPS NEEDED CONNECCTION OF LINESET TO COMPRESSOR - UNABLE TO VERIFY ALUMINUM CONNECTION TO COPPER CONDUCTORS IN JUCTION BOX FOR LISTED CONNECTORS - EXISTING ALUMINUM CONDUCTORS UNDERSIZED FOR 60 AMP OVERCURRENT PROTECTION |