Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T14CM07095

Parcel: 12213035B

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
09/24/2015 ENGINEERING - FINAL Approved
09/23/2015 ENGINEERING - FINAL Continued CREWS WORKING ON THE LEVELING OF THE HANDICAP ACCESS PARKING SPACES AND OFF LOADING ZONE.
09/23/2015 ENGINEERING - FINAL Continued STOPPED BY AFTER THE CREWS LEFT FOR THE DAY AND CHECKED THE SLOPES OF THE HANDICAP ACCESS AREAS, EVERYTHING APPEARS TO BE UNDER 2%.
09/21/2015 ENGINEERING - FINAL Continued CONTRACTOR HAS CANCELLED THIS INSPECTION FOR TODAY AND WILL HAVE IT DONE AGAIN ON 9/23/2015 AFTER THE WORK IS READY TO START.
09/16/2015 ENGINEERING - FINAL Not ready for Inspection CONTACTED THE CONTRACTOR AND DISCUSSED THE ISSUES AT HAND. HE WILL SET UP THE CREWS TO WORK ON THIS SITE AND WILL LET ME KNOW WHEN THEY WILL BE ON SITE TO DISCUSS THE WORK PRIOR TO STARTING IT.
09/15/2015 ENGINEERING - FINAL Not ready for Inspection NO ONE ON SITE AT THIS TIME. HANDICAP RAMP EXCEEDS THE RISE FROM THE PAVEMENT TO THE RAMP, OVER AN INCH, 5/8 THS INCH MAXIMUM. CONTRACTOR WANTS TO MEET ON SITE TO DISCUSS THE REQUIRED WORK.
09/10/2015 ENGINEERING - FINAL Not ready for Inspection INSTALL ACCESSIBLE RAMP/PARKING/SIGN PER CODE AND PER PAGE A-2.
09/08/2015 ENGINEERING - FINAL Not ready for Inspection NO PLANS OR PERMITS ON SITE.
06/02/2015 ENGINEERING - FINAL Continued MET WITH GC ON SITE SIDE WALKE AT MAIL BOX OVER 2% CROSS SLOPE.