Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 07/18/2017 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
LEVEL #6, POOL BAR AREA, 4 HEATER OUTLETS, TESTED AT 15 psi. CALLED IN TO S.W. GAS AT 0845 HOURS. |
| 04/02/2017 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
TEST GUAGES AT LEVEL #5; LINES TO LEVEL #8 TO ROOF. |
| 12/21/2016 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
2" GAS LINE AT LEVEL #5 AT 75 psi. |
| 12/15/2016 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
3" LINE THROUGHOT TO BOILER ROOMS: 2" LIES TO GENERATOR ROOMS, CONTINUED TO AREA 5 SOUTH AT REGULATOR TO PATIO HEATERS. SCOTT (LEAD PLUMBER) TO CHECK ON REGULATOR VENTING IN ALL GENERATOR ROOMS. |