| 08/17/2017 |
PLUMBING - INTERMEDIATE |
|
Approved |
|
| 08/09/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
LEVEL #1, AC BAR AREA, KITCHEN, BREAKROOM, ENGINEERING ROOM. |
| 08/07/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
BAR AREAS ON LEVELS #6 AND #1. OK TO COVER WALLS. |
| 06/21/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
PLUMBING ROUGH SOIL - DOMESTIC WATER LINES (2 @ 3") FROM METER AREA TO BACK-FLOW PREVENTER. NORTH SIDE OF ENTRY RAMP. OK TO COVER PROGRESS AREA. |
| 03/28/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
WATER LINES (PEX) GUEST ROOMS IN AREAS A. B, C |
| 03/09/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
WASTE AND VENT LINE IN GUEST ROOMS #801 - 815. |
| 03/08/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
LEVEL #8, AREA 8 "A"; WASTE AND VENT LINES IN GUESTROOMS #811 - 845. HOT WATER RETURN LINE IN ALL HALLWAYS; 1" - 2" LINES. OK TO INSULATE LINES. |
| 03/03/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
WASTE AND VENT LINES (2" - 3") AT LEVEL #8; AREA 8 "A", GUEST ROOMS 847 - 861 |
| 01/27/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
REPLACED CHECK VALVES IN GUEST ROOMS AT LEVELS #6 & 7 IN AREA "A" |
| 01/27/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
REPLACED CHECK VALVES IN GUEST ROOMS ON LEVELS #6 & 7, AREA "A". |
| 01/10/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
LEVEL #6 ALL ROOMS EXCEPT FOR ROOMS #606, 612, 614,658, ICE MAKER ROOM. LEVEL #7 : ROOMS 706, 712, 758, ICE MAKER ROOM. |
| 01/09/2017 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
DOMESTIC WATER LINES (1" - 4") HYDROSTATIC TESTING: LEVEL #1, LINES TO BOOSTER PUMP, MECHANICAL ROOMS, LEVEL #1 EAST; LEVEL #3: LAUNDRY ROOM, BOILER, WATER SOFTENER SYSTEM; LEVEL #4: MECHANICAL ROOM BOILERS, MIXING VALVES SERVES ROOMS AT LEVELS 1 - 8. ALL LINES ARE UNDER TEST. |
| 12/21/2016 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
LEVEL #7, GUEST ROOM #736, WASTE AND VENT LINES. |
| 12/15/2016 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
LEVEL #7 GUEST ROOM WASTE LINES IN #726, 728, 730, 732, 734. |
| 12/08/2016 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
LEVEL #7 WASTE LINES IN ROOMS #747, 748, 749, 751, 753, 755, 759, 761, 762, 758, 756, 754 |
| 12/01/2016 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
WASTE LINES IN GUEST ROOMS ON LEVEL #7: 717, 719, 721, 723, 725, 727, 729, 731, 733, 735, 737, 739, 741, 743, 745. |
| 11/24/2016 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
WASTE LINES ABOVE CEILINGS IN ROOMS #701 THROUGH 715 (EXCEPT ROOM #714) |
| 11/02/2016 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
LEVEL #6: 2" - 4" WASTE LINES IN ROOMS: 610, 612, 614, 616, 628, 630, 632, 634, 636, 644, 648 |
| 09/12/2016 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
LEVEL 5 - 5.5 AT GL: A - E/ 6 - 8. LEVEL 6: C - G/ 1 - 5; WASTE AND VENT LINES (CAST IRON PIPING) |