Permit: T14CM06599

Parcel: 117062000


Addresses:

151 E BROADWAY BL


Inspection Status: Approved

Inspection History: FRAMING

Permit Number - T14CM06599

Inspection Description - FRAMING

Inspection Status - Approved

Date Description Inspector Results Comments
08/17/2017 FRAMING Approved
07/28/2017 FRAMING Partial Approval ROOMS 605A, 605B, 607. OK TO SHEET ROCK
07/06/2017 FRAMING Partial Approval NORTH EAST CANOPY - OK TO COVER AREAS WITHOUT ELECTRIC.
07/03/2017 FRAMING Partial Approval LEVEL #1, ELEVATOR AREA (102), ROOMS #101, 105, 109. OK TO COVER PROGRESS AREAS.
06/22/2017 FRAMING Partial Approval ELEVATOR LOBBYS AT LEVELS 2.5 - 4.5. OK TO COVER WALLS.
06/13/2017 FRAMING Partial Approval ELEVATOR LOBBIES, ELEVATORS #1 & 2: LEVELS: 5.5, 4.5, (NO LID - NEEDS TO BE RAISED), 3.5, 2.5, 1: (WALLS AND LIDS), LEVEL #1; NORTH EAST CANOPY AT GL: A- B/6 - 8.
06/08/2017 FRAMING Partial Approval HARD LIDS AT EXISTS AT LEVEL #1, EAST AND WEST STAIRWELLS.
06/05/2017 FRAMING Not ready for Inspection WORK INCOMPLETE
06/02/2017 FRAMING Partial Approval ELEVATORE #1 & 2; AREA HARD LID CEILINGS. lEVELS #6, 7, 8.
06/01/2017 FRAMING Partial Approval 3 POP-OUTS AT GL: G/4.5 - 5/5 AT LEVELS 2 AND 3. OK TO COVER PROGRESS AREAS.
05/29/2017 FRAMING Partial Approval ELEVATORS 1 & 2 AT LEVELS 6, 7, 8 - ELEVATOR AREAS.
05/16/2017 FRAMING Partial Approval STORAGE ROOM (ADDED) AT WEST STAIRWELL NEXT TO POOL EQUIPMENT ROOM.
05/04/2017 FRAMING Partial Approval LEVEL #8, BATHROOM AND ROOM CEILINGS; ROOM# 802, 806, 808, 810, 812. LEVEL #1; GL: A - D/2 - 8. OK TO COVER PROGRESS AREAS.
04/25/2017 FRAMING Partial Approval LEVEL #8, AREA "C" CEILINGS, GUEST ROOM CEILINGS: 801, 803, 805, 807, 809, 811, 813, 815; HALLWAY 8 "C"
04/17/2017 FRAMING Partial Approval LEVEL #8, AREA "A", GUEST ROOMS CEILINGS: 847, 849, 851, 853, 852, 854, 855, 856, 857, 858, 859, 861, 862.
04/05/2017 FRAMING Partial Approval LEVEL #8, ARA "B" ROOMS: 826, 828, 830, 832, 834, 836. AREA "C" 801 -817.
04/04/2017 FRAMING Partial Approval LEVEL 8 - ROOMS 817, 819, 821, 823,825, 827, 829, 831, 833, 835, 837, 839, 841,843, 845
04/04/2017 FRAMING Partial Approval LEVEL #8: ROOMS #817, 819, 821, 823, 825, 827,829, 831, 833, 835, 837, 839, 841, 843, 845.
03/23/2017 FRAMING Partial Approval ELEVATOR ROOMS AT ROOF LEVEL (1, 2, 3)
02/28/2017 FRAMING Partial Approval LEVEL #6; 6 "A" - ROOMS 647 - 661. OK TO COVER
02/21/2017 FRAMING Partial Approval LEVEL #8, HAT CHANNEL IN ROOMS: 802, 806, 808, 810, 812; HALLWAY 818.
02/16/2017 FRAMING Partial Approval LEVEL #9; ROOMS 901 - 902.
02/13/2017 FRAMING Partial Approval LEVEL #8, HAT CHANNEL IN HALLWAY "B"; EAST SIDE OF AREA "C"; ROOMS 815 - 809. OK TO COVER PROGRESS AREA.
02/08/2017 FRAMING Partial Approval HAT CHANNEL AT LEVEL #8; AREAS A AND B; B SOUTH UP TO ROOM #827.
02/01/2017 FRAMING Partial Approval PRESSURIZEDSHAFTS AT LEVELS 2 - 2.5, 4 - 4.5, 5.5. SHEET ROCKED - OK TO TAPE.
01/30/2017 FRAMING Partial Approval AREA "A" ON LEVELS 6 & 7; SHAFTS IN GUEST ROOMS. OK TO UNSULATE AND COVER WALLS, EXCEPT FOR ROOMS 662, 652, 762, 754.
01/27/2017 FRAMING Partial Approval ROOF AREA: BACKING IN SE STAIRWELL (STRAPPING AT STAIRWELL CEILING). OK TO COVER.
01/26/2017 FRAMING Partial Approval LEVEL #6: AREA "A", SHAFT FRAMING IN GUEST ROOMS.
01/23/2017 FRAMING Partial Approval GUEST ROOM CEILING FRAMING LEVEL #6: ALL GUEST ROOMS EXCEPT ROOMS 605, 662. ROOMS 609 AND 629 - MOVE STUDS AWAY FROM SPRINKLER HEAD. LEVEL #7: GUEST ROOMS IN AREAS "A" AND "B" - EXCEPT FOR ROMS 745, 754, 750, 761, 762. SE WIND WALL AT LEVELS 4 - 6 GL: G/6 - 8. OK TO COVER PROGRESS AREAS.
01/19/2017 FRAMING Partial Approval SE AND SW STAIRWELL ROOFS AT LEVEL #9. OK TO COVER.
01/12/2017 FRAMING Partial Approval EAST PARAPET WALL; ROOF CRICKET (EAST). OK TO COVER.
01/09/2017 FRAMING Partial Approval SOUTH WEST WIND WALL AT LEVELS #4 - #8; GL: G.5/1 - 4.
12/28/2016 FRAMING Partial Approval ROOM #903; PARAPET POP-OUT(NW) AREA "A"
12/21/2016 FRAMING Partial Approval 1. SHEAR WALLS IN ELEVATORS 1, 2, 3, ; LEVEL 6 - 8. 2. ROOMS 901 AND 902 FLOOR BRACING & WALLS; ELEVATOR AND MECHANICAL ROOM AMD ELECTRIC ROOM.

3. WEST STAIRS , SHEAR PANELS.
12/19/2016 FRAMING Partial Approval ELEVATOR #3, LEVEL #8, NORTH, SOUTH AND EAST WALLS; ELEVATORS #1 & 2, LEVEL #8, EAST, WEST AND SOUTH WALLS. LEVEL #9 WEST STAIRWELL; ELECTRIC ROOM #902, SHEATHING AND METAL FRAMING.
12/18/2016 FRAMING Partial Approval ELEVTORS #1 & 2, LEVELS 6 & 7 - INTERIOR/EXTERIOR SHEET ROCK AND METAL SHEATHING: ELEVATOR #3 - LEVELS 6 - 8 INTERIOR ONLY.
12/11/2016 FRAMING Partial Approval AREA "A" JOIST AND METAL DECKING(SCREWS AND WELDS)
11/28/2016 FRAMING Partial Approval NORTH WINDWALL; EXTERIOR FRAMING AROUND PERIMETER OF BUILDING, (LEVEL #8 - EXTERIOR BEARING WALLS
11/18/2016 FRAMING Partial Approval AT LEVEL 8, ALL DOOR AND WINDOW JAMBS WELDING APPROVED WITH SPECIAL INSPECTION APPROVAL.
11/08/2016 FRAMING Partial Approval SOUTH EAST STAIRWELL AT LEVEL #8: HOLES DRILLED FOR PLACEMENT OF TITIAN ANCHORS - OK TO PLACE ANCHORS: SPECIAL INSPECTION TO OBSERVE PLACEMENT.
10/16/2016 FRAMING Partial Approval LEVEL #7; ALL ROOMS AND CORRIDORS EXCEPT FORROOMS #712, 720. 726, 736, 748, 752, 750
09/01/2016 FRAMING Partial Approval LEVEL #6 - ROOMS AND HALLWAY CEILINGS (CORRIGATED METAL SHEETING). RISER ROOMS NEED TO DOUBLE STUDS FOR ALL DOOR JAMBS: OK TO PROCEED. ELEVATOR LOGGYS AT LEVELS 5.5, 4.5, 3.5, 2.5; WIND WALL (NORTH) AT BOTTOM OF LEVER #6 TO MID AREA OF LEVEL #3 AT GL: A3 - A8. LEVEL #5, WEST STAIRS (FRAMING ONLY).
08/01/2016 FRAMING Partial Approval LEVELS 6 & 7 EXTERIOR WALLS AND SHEAR BEARING AT GL: A/5 - G/8, INTERIOR/EXTERIOR BEARING GL:B/3.5 - G/3.5; INTERIOR WALLS G: 5.5/B.5 - G (ROOMS 647 - 661)
07/18/2016 FRAMING Partial Approval LEVEL 6 & 7: EXTERIOR FRAMING : GL: G.5/1 - 3.5; 1/A - G.5, G.5/1 - 5.5. EXTERIOR ROOMS: 629 - 661 GL: G.5/2.5 - 1; 1/A - G.5; A/1 - 5.5