Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date |
Description |
Inspector |
Results |
Comments |
| 08/17/2017 |
BUILDING PRE-SLAB |
|
Approved |
|
| 07/05/2017 |
BUILDING PRE-SLAB |
|
Partial Approval |
CRANE POUR-BACK SLAB 9'6" X 9'8" X 22". POUR BACK SLAB TO 6" DOWN TO JOIN EXIXTING SLAB. REMAINING 6" SLAB TO BE AT 3500 PSI AND MICRO FIBER ADDED. CHANGE APPROVED BY ARCHITECT AND ENGINEER. |
| 01/30/2017 |
BUILDING PRE-SLAB |
|
Partial Approval |
SLAB AREA IN QUESTION WAS INSPECTED ON 27 JANUARY 2017. |
| 10/17/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
LEVEL #8: METAL DECKING AND REBAR; REBAR AROUND SHAFTS IS TOO HIGH; BARS IN QUESTION NEED TO BE LOWERED FOR CLEARANCE TO TOP OF SLAB. OK TO POUR WHEN CORRECTIONS HAVE BEEN COMPLETED. |
| 09/02/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
LEVEL #7 - STEEL DECKING; OK TO POUR PROGRESS AREA. |