Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T14CM06286
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2016 | PLUMBING - ROUGH, SOIL | Approved | ||
07/21/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | PROGESS AREA TIE INTO INTERCEPTER | |
07/20/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
07/17/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | PROGRESS AREA RESTROOM AND ROOF DRAIN | |
07/15/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | PROGRESS AREA PLANTER DRAINS ROOF DRAINS ON NORTH WEST | |
07/15/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | PROGRESS ON ROOF DRAINS NORTH TO SOUTH | |
07/11/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | GRID LINES (6 TO 8 / A TO H) UNDERGROUND PLUMBING OK TO COVER. | |
07/10/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | TWO WASTE INTERCEPTORS OK TO COVER. NOTE (WAITING FOR RFI ON STORM WATER WASTE DISPOSAL) |
|
07/06/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | UNDERGROUND PLUMBING A-C/1-5.5 ; C-D/1-6 OK TO BACKFILL ELECTRICAL: OK TO COVER CONDUITS FROM B TO F/4 TO 7 SOUTH SIDE OK TO COVER LOW VOLTAGE CONDUITS B TO G 1.3 NORTH SIDE |
|
06/24/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | 3-3" PLANNER DRAINING STUB OUT EAST SIDE |