Inspection History Details
Inspection Status: Cancelled
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2015 | FIRE SPKLR - FINAL | Cancelled | ||
| 02/13/2015 | FIRE SPKLR - FINAL | Denied | 1. Still need to finish prior punch list. | |
| 01/14/2015 | FIRE SPKLR - FINAL | Denied | 1. Still needs to be monitored 2. Door separating mixing room and spray paint room shall be self-closing and latching, need to add a sign stating door needs to stay shut at all times. Reason for this is the sprinkler calculations work on all heads at once in the spray booth the head in the mixing room is not part of the calculations if it was the calculations will not work and a possible fire pump will need to be added. 3. Central Alarm sent letter that monitoring has been shut down due new phone line system the new phone lines will not work with the old panel. |