Case: T13DV01976

Parcel: 138181020


Addresses:

210 E CORONA RD

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
06/02/2015 INSP - FOLLOW UP CODE ENFORCE Approved The permit is still current and expires on 9-18-15. Will check in 90 days. RV.
10/23/2014 INSP - FOLLOW UP CODE ENFORCE Approved Permit expires on 11-18-14. Will check in 30 days. RV.
06/23/2014 INSP - FOLLOW UP CODE ENFORCE Approved The permit is still current and the last inspection was on 5-22-14 and needing correction. Will check in 90 days. RV.
05/06/2014 INSP - FOLLOW UP CODE ENFORCE Approved Talk to the owner and will be calling for an inspection. Most of the work has been done and lacking some of the H2.5 clips on the new beam on the front section. Will check in 45 days. RV.
02/03/2014 INSP - FOLLOW UP CODE ENFORCE Approved Permit current and expires on 5/25/14. Will check in 90 days.
10/29/2013 INSP - FOLLOW UP CODE ENFORCE Approved Talk to the owner and they were waiting for the person to do the work until December. Did let the owner know that the permit expires on 12-28-13. Did go over that the footings were done and could call for the footings and that will give them another 6-months for the permit to expire. The owner will call for the inspection and will check in 90 days. RV.
07/16/2013 INSP - FOLLOW UP CODE ENFORCE Approved The permit has been issued, T13CM02061 on 7-1-13 with no inspection done. Will check in 90 days. RV.
05/22/2013 INSP - FOLLOW UP CODE ENFORCE Approved Met with the owner and the plans are being drawn at this time. The draftsman will hope to have the plans done in a couple weeks. The post will be moved 6' from the property line and currently 5'. Did asked if they could leave at 5' and if they are requesting a fire wall. The footings are dug out and advised to not fill them in until the permit has been issued and inspected before poured. The owner has been in contact at all times and letting know what is being done with the plans. Will check in 45 days. RV.