Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/27/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The permit has been finaled on 12-13-13. At this time the case will be closed. Violation Abated, Close Case. RV. |
| 11/26/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Have been in contact with draftsman and correction are still be done. The last inspection was done on 10-8-13. Some changes need to be done on the plan before the finals are done. Will check in 60 days. RV. |
| 09/16/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Work is still being done and the permit is still current and the last inspection was done on 7-30-13 and needs corrections. Will check in 45 days. RV. |
| 07/16/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The permit has been issued, T13CM02184 on 6-13-13 with no inspection done. Will check in 60 days. RV. |
| 05/22/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Talk to the draftsman and he is getting the signatures from the nieghbors so the plans don't have to go through the D.D.O. process. The plans have been completed and lacking the zoning approval and checking the setbacks. Will check in 45 days. RV. |
| 04/09/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The draftsman called and the plans will require a D.D.O. and will be submitting in a couple weeks. All the structures are going to remain and will be addressed under the D.D.O. The draftsman will be addressing the D.D.O. Will check in 45 days. RV. |