Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2015 | FRAMING | Approved | IVRS - Inspection :* | |
| 07/20/2015 | FRAMING | Partial Approval | IVRS - Inspection :* | |
| 07/14/2015 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 06/24/2015 | FRAMING | Partial Approval | 3RD FLOOR OK TO SHEET ROCK | |
| 02/10/2015 | FRAMING | Partial Approval | IVRS - Inspection :* | |
| 02/10/2015 | FRAMING | Partial Approval | MET W/ ARCH, OWNER, & GC TO RESOLVE PLAN ISSUES | |
| 02/06/2015 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 02/06/2015 | FRAMING | Not ready for Inspection | PROVIDE DETAILS ON 30 MINUTE RATED ASSEMBLIES @ RATED PARTITIONS | |
| 02/03/2015 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 02/03/2015 | FRAMING | Denied | - COIL STRAPS WITH MINIMUM 8D NAILS ON OVER-NOTHCED PLATES - NAIL OFF TRUSS - FIX PER ENGINEER SPECS |
|
| 07/31/2014 | FRAMING | Partial Approval | IVRS - Inspection :* MET WITH JOHN DELIVERED EMAIL ON CORRIDER WINDOWS FROM LEE RAY. SEE ATTACHED EMAIL |
|
| 07/30/2014 | FRAMING | Partial Approval | MET WITH JON DELIVERED EMAIL ON CORRIDOR WINDOWS FROM LEERAY | |
| 07/29/2014 | FRAMING | Denied | PLANS SHOWING OPERABLE WINDOWS IN CORRIDORS WERE APPROVED IN ERROR. DO NOT SIGN OFF ON ANY FRAMING UNTIL THESE WINDOW INSTALLTIONS HAVE BEEN REVISED AND APPROVED. REFERENCE IBC SECTIONS 105.6 |