Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T12DV07803
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/01/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | ALL VIOLATIONS ABATED CLOSE CASE. | |
02/01/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | ON SITE INSPECTION RESULTS; THE MC CABLE IS ATTACHED FROM J BOX TO UNKNOWN EXTERIOR OF THE MOBILE HOME, THIS IS AN ILLEGAL EXTENSION OF A CIRCUIT. THERE ARE TWO WOOD FRAMED WALLS UNDER THE REAR PART OF THE AWNING, ALSO A VIOLATION. PHOTOS WERE TAKEN. INFRACTION HEARING SET FOR TODAY AT 1000AM, SEE COURT NOTES IN CONDITIONS | |
11/20/2012 | INSP - FOLLOW UP CODE ENFORCE | Approved | THE SIDES TO THE ADDITION WERE REMOVED. THE CIRCUIT THAT HAS BEEN EXTENDED STILL EXISTS AND IS IN USE. THE WIRING METHODS ARE UNAPPROVED. THE EXTERIOR JUNCTION BOX FASTENED TO THE MOBILE HOME DOES NOT HAVE THE REQUIRED PROTECTED COVER, THIS IS THE LOCATION WERE THE CIRCUIT CONTINUES BY MEANS OF METAL CLAD CABLE WHICH IS SECURED THE TO MOBILE HOME AND RUNS TO ANOTHER JUNCTION BOX THAT IS NOT PROPERLY FASTED THE MOBILE HOME, AT THIS LOCATION THERE IS NONMETALLIC-SHEATHED CABLE THAT IS BEING FEED FROM THE SECOND JUNCTION BOX RUNNING TO AN UNKNOWN SOURCE. |