Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T12CM08030
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2014 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
05/29/2014 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | FOOTINGS FOR NW CORNER RAMP AND STAIRS OK TO POUR | |
04/09/2014 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1. NORTH DUMPSTER SURROUND FOOTING OK TO POUR. 2. NORTH HALF OF EAST PROPERTY WALL FOOTING OK TO POUR. |
|
03/12/2014 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | EAST DUMPSTER FOOTINGS AND EAST PROPERTY WALL FOOTINGS OK | |
11/25/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | SOUTH SIDE EAST AND WEST GRADE BEAMS AND SLURRY WALLS OK | |
10/21/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F6 FOOTINGS AT M- NORTH AND 21- EAST OK F3 FOOTINGS AT M + U OK |
|
09/16/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | WF1s and WF3s - 12.34/B - 12.36/J - OK Elevator A pad OK to pour |
|
09/16/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | footing at 12.35 - A to H at elevation change ok | |
09/05/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | west side slurry walls ok to pour | |
09/04/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | East and west culvert grade beam steel and pour ok. East side slurry wall steel and pour ok. Tyler Fauth, project engineer, approved a fall of 15' for the slurry mix. Footings ok at B/13.6 to B/15.5, and D2/14.7 to D2/13. Footing ok at H/0.1 to Z/11.1 |
|
08/09/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | caissons cages and pour ok caissons : 1-f,12-f, 1-g, j-2.1, j-3, j-5, k-6, 12.1.5-j, l-1, n.1-9, p-10, q-11, s.1-11, q-6, REF-north-f, REF-south-f, REF-g g-1 got engineers approval for changes on 8/9 |