Inspection History Details
Inspection Status: Denied
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2013 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 05/09/2013 | BUILDING - FINAL | Denied | 1. MAINTAIN WORKING SPACE AT PV PANEL 110.26 2. SEAL ENTRANCES ABOVE CURRENT CARRING PARTS WITH APPROVED DEVICES 3. TIGHTEN LOOSE FITTINGS & LUGS 4. NEED LABEL AT COMBINER PANEL (90.1) 5. DATA BOX AND INTERIOR PLUG STRIP NOT LISTED 6. USE APPROVED GROUNDING TERMINATIONS FOR WEEB SYSTEM 690.41-43 7. SECURE DC CONNECTORS UP UNDER MODULES 8. SECURE SUPPORTS TO ROOF WITH SEALANT 9. PLANS CALL FOR 80A PV INTERCONNECT BREAKER 150A INSTALLED |
|
| 03/19/2013 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SOLAR INSTALL NOT COMPLETED |