Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/20/2012 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection :* |
| 12/18/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. I am allowing clean-outs on the horizontal revents due to space restrictions. ABS may not be directly embedded in concrete. |
| 12/07/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. ABS DWV under slab, mains only except at Produce OK to cover mains. Recall for floor sink installation as they are set. Leave a message when scheduling. |
| 12/06/2012 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
1. Unable to locate contractor, permit, or plans. Trenches covered with plywood. Please leave a name and contact number when scheduling this inspection. |