Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/01/2013 | MECHANICAL - INTERMEDIATE | Approved | ||
| 11/21/2012 | MECHANICAL - INTERMEDIATE | Denied | PROVISDE A MIN 6" CLEARANCE FROM COMBUSTIBLE AT FURNACE SINGLE WALL VENT ON USE DOUBLE WALL PROVIDE A TRAP IN CONDENSATE CHAIN LINE PROVIDE AN OVERFLOW SENSOR IN SECONDARY DRAIN CONNECT OVERFLOW SENSOR ON PUMP PROVIDE ELEC TO CONDENSOT PROVIDE A GFI RECEPTOR ON ROOF DO NOT USE WHITE WIRE TO POWER A/C UNIT PROVIDE A PROTECTIVE COATING ON EXPOSED ARMA FLEX AND PVC SUPPORT PVC ON ROOF EVERY 4' CONNECT PUMP HOSE INTO PVC WITH A FITTING |