Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/31/2013 |
PLUMBING - INTERMEDIATE |
|
Approved |
|
| 01/15/2013 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
1. Make all corrections and recall inspection. |
| 12/12/2012 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
1. Plan shows 2PSIG at the meter. Is this a medium pressure system? If so, the test is to 60 pounds. Not installed per plan. Plan not accurate. Provide an accurate isometric showing the "as built" installation. Show developed length and total BTU consumption of each appliance. Roof top gas not supported per table 3-2 2006 UPC. Re-use of gas piping not permitted. Thread protectors are not approved couplings. Use std. taper threaded couplings. Black iron pipe may not be installed underground. Black iron pipe may not be directly embedded in concrete. Require a ladder for access to the second building. Require a bond between gas and electric. Require sediment traps. Underground piping covered with out inspection. |
| 12/10/2012 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
|