Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T12CM00390
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2013 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
01/16/2013 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
01/15/2013 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
01/14/2013 | PLUMBING - FINAL | Not ready for Inspection | provide all items on specified on your plan install tempering valves at all non 140* locations insulate piping labels mv locations provide backflow protetion t shake machines. Provide a direct connection for wash and rinse air gaps support drains | |
01/10/2013 | PLUMBING - FINAL | Not ready for Inspection | COMPLETE ALL WORK SHOWN ON PLAN. RPZS SHOWN ON PLAN. WATER HAMMER ARRESTORS REQUIRED AT FLUSHO MESTERS. CORRECT CHUCK VALVE LOCATION AT WH. INSTALL ALL THERMOSTATS SHOWN PROVIDE 140 DEGREE AND 110 DEGREE WATER TO ALL LOCATIONS AS INDICATED ON PLAN. PROVIDE MIN REQ CLEARANCES AT VENT TERMINATIONS SUPPORT ALL VALVES |