Permit: T12BU01082

Parcel: 11504480A


Addresses:

1020 N TYNDALL AV


Inspection Status: Approved

Inspection History: FIRE SPKLR - OH PIPING & HYDRO

Permit Number - T12BU01082

Inspection Description - FIRE SPKLR - OH PIPING & HYDRO

Inspection Status - Approved

Date Description Inspector Results Comments
06/19/2013 FIRE SPKLR - OH PIPING & HYDRO Approved
05/16/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 14th floor 200lb test approved.
04/25/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 200 psi and placment for the following:
basement
south and north roof level
south and north standpipes
1. Need to correct sprinkler coverage next to white waste pipe in the basement in the parkin=g area and the maintance room.
2. Add sprinkler coverage under 54" duct in the maintance area.
04/16/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 13th floor two hundred pound test approved.
04/02/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 12th floor ohpt complete
03/27/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 1. 11th floor 200lb test approved. copper pipes blocking coverage in hallways.
03/19/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval OH Hydro approved 10th floor.****NOTE in common hallways need to check sprinkler coverage from duct work and piping as per statement date 2.11.2013.
03/15/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 9th floor 200 lb test ok
03/12/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 8th floor overhead psi 200 lb test approved.
03/05/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 6th and 7th floor complete
02/15/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 5th floor opht complete.
02/11/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 4th Floor - Unit K #403 Add head in the dinning area
Common hallways need to check coverage some heads blocked by piping and is there going to be a drop ceiling?
Need to keep a close eye in the washer dryer room head needs 18" clearance or follow table 8.10.6.2.2 NFPA 13 2010.
02/01/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval
01/31/2013 FIRE SPKLR - OH PIPING & HYDRO Cancelled IVRS - RI canceled
01/24/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 3rd floor complete
01/23/2013 FIRE SPKLR - OH PIPING & HYDRO Partial Approval 2nd floor opt complete.