Inspection History Details
Inspection Status: Compliance
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
Permit Number - T12BU00520
Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO
Inspection Status - Compliance
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2012 | FIRE SPKLR - UG, PIPING, HYDRO | Compliance | Received underground certificate paperwork from contractor that was signed by Tucson water employee showing that pressure testing and flush was done per NFPA standards. | |
05/30/2012 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | All underground piping for fire service was buried, pressure tested and flushed with out a Tucson fire Inspector on site. According to the contractor a person name Jim from Tucson Water department wittiness all testing and stated that they will call TFD and clear it with us. Tucson Fire has not received anything from Tucson water. I told contractor to have Tucson water call me and e-mail on what they witness if they did wittiness all testing, we will clear the underground stating that Tucson water did all underground inspections. | |
05/30/2012 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | Shall remove concrete 2" inches around 8" stub out can not have concrete up against pipe, concrete can expand and collapse pipe. |