Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2012 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 04/16/2012 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 04/13/2012 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) FINISH #2 PREVIOUS 2) SPLIT BOLT FOR ONLY 2 CONDUCTORS-A RUN AND A TAP 3) NEED ACCESS TO SUB PANELS |
|
| 09/07/2011 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) CANNOT ENTER OR EXIT TOP END WALL PER MANUFACTURES INSTRUCTIONS 2) PROTECT CONDUCTORS 300.4 3) NEED ANIT OXIDE COMPOUND ON ALL ALUMINUM CONDUCTORS 110.3 4) CANNOT USE SHEET METAL THREAD SCREWS FOR GROUNDING 250.8 5) SEPERATE GROUNDS AND NEUTRALS AT SUB PANEL & PROVIDE A NEUTRAL 250.24 & 200.6 6) SECURE "SE" CABLE TO BOX 312.5 (C) 7) PROVIDE PHYSICAL PROTECTION FOR "SE" CABLE 8) MAINTAIN WORKING SPACE AT STORAGE PANEL 110.26 9) USE LISTED CONNECTOR FOR COPPER AND ALUMINUM |