Case: T11DV07118

Parcel: 130191630


Addresses:

4621 E 32ND ST

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
04/23/2012 INSP - FOLLOW UP CODE ENFORCE Approved Compliance
Site inspection, ceiling repaired just about completed, first coat of mud applied. Tenant has complied, all violations have been abated to code requirements.
04/20/2012 INSP - FOLLOW UP CODE ENFORCE Approved Compliance site inspection. Leak currently being repaired. Inspection scheduled for 4/23/2012 at 10 AM.
04/02/2012 INSP - FOLLOW UP CODE ENFORCE Approved TENANT CONTACTED INSP.
Requested compliance inspection to be moved to next week due to work schedule. Stated working on ceiling issues, turned out more work needed prior to completing patching, tenant will contact inspector later this week for compliance insp.
03/01/2012 INSP - FOLLOW UP CODE ENFORCE Approved COMPLIANCE INSP
All trash, garbage removed from back yd, lacks ceiling patch, should be completing abatement process w/in 2 wks. Will contact insp. when patch is completed, 30 day fw/up
02/22/2012 INSP - FOLLOW UP CODE ENFORCE Approved Will be meeting resident on site 0n 3/01/2012.
01/11/2012 INSP - FOLLOW UP CODE ENFORCE Approved COMPLIANCE INSP.
Site inspection, contact made w/tenant. Entry allowed to assess progress, living rm flooring completed, storage & carpeting removed in SE bedrm. Approx 50% of soiled debris & garbage removed from under canopy. Next insp.-all items under canopy to be removed & flooring in bdrm completed. No progress on sewing rm ceiling. 30 day fw/up.
12/09/2011 INSP - FOLLOW UP CODE ENFORCE Approved COMPLIANCE INSP.
Site inspection, very little progress made, small section of floor tile set down by front entry door, stated due to misc. issues has not been able to address issues in back yard. Apply reinspection fee & schedule fw/up in 30 days.
11/08/2011 INSP - FOLLOW UP CODE ENFORCE Approved COMPLIANCE INSP.
Site inspection, met w/occupant, walked interior, section of tile replaced in kitchen, hallway & living rm. Walls painted in hallway,
1-bdrm. in south side middle rm.living rm. Drywall removed from S.E. bd rm, no progress on outside storage issues. Next inspection, painting to be completed & flooring. 40% of outside storage items to be gone. 30 day extension.
09/22/2011 INSP - FOLLOW UP CODE ENFORCE Approved COMPLIANCE
Site meeting with tenants, inspection to allow structure to be re-occupied. Inspection of all interior habitable areas found interior has been cleared of all cat feces, areas carpeted. removed, flooring & walls cleaned. Amended NOV to be sent for exterior sanitation issues.
09/16/2011 INSP - FOLLOW UP CODE ENFORCE Approved OPEN STRUCTURE/CLEAN-UP
Site meeting with tenants, structure opened to allow tenants access inside for clean-up of interior.
09/15/2011 INSP - FOLLOW UP CODE ENFORCE Approved OPEN STRUCTURE/CLEAN-UP
Site meeting with tenants, structure opened to allow tenants access inside for clean-up of interior.
09/14/2011 INSP - FOLLOW UP CODE ENFORCE Approved OPEN STRUCTURE/CLEAN-UP
Site meeting with tenants, structure opened to allow tenants access inside for clean-up of interior.
09/13/2011 INSP - FOLLOW UP CODE ENFORCE Approved OPEN STRUCTURE/CLEAN-UP
Site meeting with tenants, structure opened to allow tenants access inside for clean-up of interior.
09/12/2011 INSP - FOLLOW UP CODE ENFORCE Approved OPEN STRUCTURE/CLEAN-UP
Site meeting with tenants, structure opened to allow tenants access inside for clean-up of interior.
09/09/2011 INSP - FOLLOW UP CODE ENFORCE Approved OPEN STRUCTURE/CLEAN-UP
Site meeting with tenants, structure opened to allow tenants access inside for clean-up of interior.
09/08/2011 INSP - FOLLOW UP CODE ENFORCE Approved OPEN STRUCTURE/CLEAN-UP
Site meeting with tenants, structure opened to allow tenants access inside for clean-up of interior.