Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T11CM03269
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/16/2012 | ENGINEERING - FINAL | Approved | PAVING COMPLETE AT THIS TIME. | |
04/12/2012 | ENGINEERING - FINAL | Continued | WORKING ON PAVING SOUTH SIDE OF JOB SITE. | |
04/11/2012 | ENGINEERING - FINAL | Continued | WORKING ON GRADING SOUTH SIDE PARKING AERA. | |
04/06/2012 | ENGINEERING - FINAL | Continued | PAVING ON NORTH DRIVE WAY. | |
04/05/2012 | ENGINEERING - FINAL | Continued | DEMO ON NORTH ROAD WAY . TO REPAVE. | |
03/28/2012 | ENGINEERING - FINAL | Continued | MET WITH RON AND THE CONTRACTOR AND DISCUSSED THE WORK THAT IS BEING DONE ON THIS SITE. CREWS WILL BE REMOVING ALL OF THE EXISTING PAVEMENT AND MOST OF THE EXTRUDED CURBS ON THIS SITE IN THE NEAR FUTURE AND REPLACING IT WITH NEW ASPHALT, CURBS, AND SIDEWALK AS NEEDED. A COPY OF THE ORIGINAL SITE PLAN HAS BEEN PROVIDED AND WILL BE SCANNED INTO SIRE FOR FUTURE REFERANCE. THE CONTRACTOR IS AWARE THAT HE WILL NEED TO REPLACE THE ASPHALT AND SIDEWALK BACK TO THE ORIGINAL GRADES AS NOTED ON THIS APPROVED SITE PLAN. NO CHANGES TO THE HEIGHTS CAN BE MADE WITHOUT FIRST OBTAINING A NEW AND APPROVED SITE PLAN FOR THIS SITE SHOWING ALL EXPECTED CHANGES. |