Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 6280 S CAMPBELL AV
Search
Annexations & Original City Zoning (OCZ)
Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 12/23/2024 5:29 p.m.
Total Number Of Rezone Cases - (3)
Special Development Requests & Requirements
Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Special Development Permits - (5)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000003301 | CLOSED | 02/07/2011 | N/A | Historical Information | ||
T14SA00228 | COMPLETE | 07/29/2014 | N/A | Zoning Adminstration Letter | ||
T18SA00443 | COMPLETE | 10/01/2018 | N/A | Zoning Adminstration Letter | ||
T20SA00030 | COMPLETE | 01/14/2020 | N/A | Zoning Adminstration Letter | ZONING LETTER | |
T22SA00027 | COMPLETE | 01/21/2022 | N/A | Zoning Adminstration Letter | Zoning compliance letter for multifamily development |
Permits
Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Permits - (237)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20CM07335 | Expired | 10/26/2020 | 07/04/2021 | 3333101 | Commercial Building | PANEL UPGRADE 4 METER PACK LIKE FOR LIKE |
T20CM07335 | Expired | 10/26/2020 | 07/04/2021 | 3333102 | Commercial Building | PANEL UPGRADE 4 METER PACK LIKE FOR LIKE |
T20CM07335 | Expired | 10/26/2020 | 07/04/2021 | 3333103 | Commercial Building | PANEL UPGRADE 4 METER PACK LIKE FOR LIKE |
T20CM07335 | Expired | 10/26/2020 | 07/04/2021 | 3333104 | Commercial Building | PANEL UPGRADE 4 METER PACK LIKE FOR LIKE |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 39 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
T20CM03455 | Expired | 06/06/2020 | 12/16/2020 | 3535101 | Commercial Building | REPAIR BASE METER |
T20CM03455 | Expired | 06/06/2020 | 12/16/2020 | 3535102 | Commercial Building | REPAIR BASE METER |
T20CM03455 | Expired | 06/06/2020 | 12/16/2020 | 3535103 | Commercial Building | REPAIR BASE METER |
T20CM03455 | Expired | 06/06/2020 | 12/16/2020 | 3535104 | Commercial Building | REPAIR BASE METER |
DP12-0011 | Complete | 01/17/2012 | 07/27/2020 | Development Package | SITE FOR NEW COVERED PARKING & ENTRY SIGN | |
CD985-062A | CLOSED | 01/26/1997 | N/A | DPHIST | DEL MORAL APARTMENTS | |
CD985-062C | CLOSED | 01/26/1997 | N/A | DPHIST | LAS MONTANAS APARTMENTS | |
T01EL01529 | FINAL | 06/12/2001 | 12/11/2001 | BLDG #06 | ELECT | RECONNECT:ELECTRIC APARTMENTS |
T05CM06180 | FINAL | 12/13/2005 | 10/15/2006 | 12 | COMBO | REPAIR:VEHICLE DAMAGE |
T08CM01281 | FINAL | 04/22/2008 | 06/16/2009 | BLDG#53 | COMBO | REPAIR: FIRE DAMAGE (T08DV01712) APT. UNIT |
T09AN00397 | ISSUED | 07/10/2009 | N/A | BLDG 62 | ADDRNEW | |
T09OT01421 | C OF O | 07/13/2009 | 02/01/2010 | BLDG 62 | C-OF-O | C OF O: DAY CARE |
T10EL00267 | FINAL | 02/08/2010 | 08/10/2010 | BLDG#53 | ELECT | RECONNECT:ELECTRIC:APT |
T11BU01624 | FINAL | 12/08/2011 | 11/12/2012 | POOL/SPA | DEMO EXISTING POOL AND CONSTRUCT NEW POOL FOR APARTMENT COMPLEX | |
T11CM03269 | FINAL | 10/13/2011 | 09/24/2012 | 1 | COMBO | TI:REMODEL MULTI PURPOSE BLDG/NEW PATIO COVER |
T11EL00723 | FINAL | 03/11/2011 | 09/11/2011 | 26 | ELECT | RECONNECT:ELECTRIC APT |
T11EL01229 | FINAL | 04/29/2011 | 01/07/2012 | 36 | ELECT | ELEC RECONNECT |
T11EL01540 | FINAL | 06/03/2011 | 12/04/2011 | 1 | ELECT | REPLACE ELECTRICAL BREAKER FOR TOWNHOUSE |
T11EL01645 | FINAL | 06/14/2011 | 12/12/2011 | 24 | ELECT | RECONNECT:ELECTRIC:APT |
T11EL01953 | FINAL | 07/21/2011 | 01/18/2012 | 32 | ELECT | REPLACE ELECTRICAL BREAKER FOR TOWNHOUSE (APA) |
T11EL02407 | FINAL | 09/09/2011 | 03/10/2012 | 31 | ELECT | REPLACE: MAIN BREAKER 100AMP: RES (APA) |
T11EL02507 | FINAL | 09/22/2011 | 03/21/2012 | 30 | ELECT | REPLACE MAIN BREAKER (APA) |
T11EL02545 | WITHDRWN | 09/27/2011 | 03/25/2012 | 31 | ELECT | REPLACE MAIN BREAKER 100 AMP: RES (APA) |
T12CM00244 | EXPIRED | 02/01/2012 | 03/03/2018 | COMBO | INSTALL:PHOTOVOLTAIC SYSTEM | |
T12CM00620 | FINAL | 02/23/2012 | 12/16/2012 | COMBO | 13 PARKING CANOPIES THRU OUT SITE. | |
T12EL00032 | FINAL | 01/04/2012 | 07/04/2012 | BLDG#53 | ELECT | RECONNECT:ELECTRIC:APT-#53102 |
T14CM07411 | FINAL | 10/31/2014 | 05/03/2015 | 23 | COMBO | REPL MAIN BREAKER (APA) |
T14CM08013 | FINAL | 11/21/2014 | 03/13/2016 | 32 | COMBO | REPL 100 AMP MAIN BRKR & BUSSING (APA) |
T15CM01656 | FINAL | 03/12/2015 | 09/13/2015 | 25 | COMBO | REPLACE MAIN BREAKER & BUSSING - LIKE-FOR-LIKE (APA) |
T15CM01746 | FINAL | 03/16/2015 | 09/22/2015 | 25 | COMBO | REPLACE MAIN BREAKER & BUSSING - LIKE-FOR-LIKE (APA) |
T15CM05766 | WITHDRWN | 08/18/2015 | 02/14/2016 | 25 | COMBO | REPLACE MAIN 100 AMP VREAKER AND BUSSING LIKE FOR LIKE. (APA) |
T15CM05767 | FINAL | 08/18/2015 | 02/21/2016 | 1* | COMBO | REPLACE MAIN 100AMP BREAKER AND BUSSING LIKE FOR LIKE (APA) |
T15CM06877 | FINAL | 10/05/2015 | 04/05/2016 | 28 | COMBO | 4 METER PACK REPLACEMENT LIKE FOR LIKE;APTS |
T17CM09469 | FINAL | 12/27/2017 | 07/02/2018 | 17 | COMBO | REPL BUSSING & METER SOCKET |
T18CM00803 | FINAL | 01/31/2018 | 08/01/2018 | BLDG#3 | COMBO | ELECTRICAL RECONNECT |
T18CM00922 | FINAL | 02/06/2018 | 08/12/2018 | 4 | COMBO | REPLACE BUSSING BREAKER |
T18CM01687 | FINAL | 03/02/2018 | 09/02/2018 | 28 | COMBO | ELECTRIC RECONNECT |
T19CM06227 | FINAL | 08/27/2019 | 02/25/2020 | COMBO | ELECTRICAL UPGRADE NOT GREATER THAN 200AMPS | |
T19RW07672 | FINAL | 12/23/2019 | 01/25/2020 | ROW | (2) 5X5 bellholes in dirt/blktop on Del Moral Blvd---- to repair/replace gas line | |
T20RW00997 | FINAL | 02/18/2020 | 04/18/2020 | ROW | 2 5x5 bellholes in dirt/blktop front---- to repair/replace gas line OLD PERMIT T19RW07672 | |
T20RW02780 | FINAL | 05/15/2020 | 09/21/2020 | ROW | 2 5X5 bellholes in dirt/blktop -----to repair/replace gas line (Previous Reference permit T20RW00997) WORK LOCATION IS ON S DEL MORAL BL |
Code Enforcement
Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Code Cases - (8)
Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO0723-04639 | Closed - Resolved | 07/19/2023 | 08/24/2023 | BLDG 14 UNIT 14104 | High Priority / Unit 14104 / No AC | |
CE-VIO0723-04596 | Closed - Resolved | 07/17/2023 | 07/20/2023 | BLDG 31 UNIT 31101 | RMIN / High Priority / Unit 31101 / No Ac last 7 days | |
CE-VIO0324-01189 | Closed - Resolved | 03/28/2024 | 08/01/2024 | PMMULT : Property maintenance deficiencies and need structure repairs. | ||
CE-VIO0723-04416 | Closed - Resolved | 07/07/2023 | 08/23/2023 | BLDG 28 UNIT 28103 | RMIN - Apt # 28103, No a/c | |
CE-VIO0723-04741 | Closed - Resolved | 07/25/2023 | 08/24/2023 | BLDG 17 UNIT 17101 | Medium Priority - Unit 17101 - AC is not functioning correctly unit is reading temperatures above 80 degrees. No temporary cooling provided | |
CE-VIO0723-04751 | Closed - Resolved | 07/25/2023 | 08/24/2023 | BLDG 2 UNIT 2103 | HIGH PRIORITY - RMIN - UNIT 2103 - No AC - AC unit will not turn on at all. | |
CE-VIO0523-03661 | Closed - Resolved | 05/22/2023 | 06/27/2023 | BLDG 20 UNIT 20101 | RMIN / Unit 20101 / Hole in ceiling from AC condensation on roof, some electrical outlets don't work in unit | |
CE-VIO0523-03701 | Closed - Resolved | 05/23/2023 | 05/26/2023 | BLDG 3 | RMIN : UNIT# 31101 / No AC for 6 days, provided portables but they blew the fuse. |
Plans
Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Plans - (1)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T05BA00183 | Approved | 06/30/2005 | N/A | -- Stormwater Basin |