Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel14022003K
14022003L
JurisdictionTucson
City of Tucson ZoningR-3
Tucson WardWard 5
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Rezoning Cases

Date - 12/23/2024 5:29 p.m.
Total Number Of Rezone Cases - (3)
Case No. Description New Zone Status Status Date
C9-83-26 Delphi Consultants - Valencia Road P-I Expired 08/04/2010
C9-85-62 Pima Savings - Bilby Road R-3 Effectuated 05/20/2010
C9-86-25 Pioneer Trust - Del Moral Boulevard R-3 Effectuated 03/04/2010

Special Development Requests & Requirements

Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Special Development Permits - (5)
Activity Number Status Apply Date Expired Date Unit Type Description
H000003301 CLOSED 02/07/2011 N/A Historical Information
T14SA00228 COMPLETE 07/29/2014 N/A Zoning Adminstration Letter
T18SA00443 COMPLETE 10/01/2018 N/A Zoning Adminstration Letter
T20SA00030 COMPLETE 01/14/2020 N/A Zoning Adminstration Letter ZONING LETTER
T22SA00027 COMPLETE 01/21/2022 N/A Zoning Adminstration Letter Zoning compliance letter for multifamily development

Permits

Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Permits - (237)
Permit Status Apply Date Expired Date Unit Type Description
T20CM07335 Expired 10/26/2020 07/04/2021 3333101 Commercial Building PANEL UPGRADE 4 METER PACK LIKE FOR LIKE
T20CM07335 Expired 10/26/2020 07/04/2021 3333102 Commercial Building PANEL UPGRADE 4 METER PACK LIKE FOR LIKE
T20CM07335 Expired 10/26/2020 07/04/2021 3333103 Commercial Building PANEL UPGRADE 4 METER PACK LIKE FOR LIKE
T20CM07335 Expired 10/26/2020 07/04/2021 3333104 Commercial Building PANEL UPGRADE 4 METER PACK LIKE FOR LIKE
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 39 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
T20CM03455 Expired 06/06/2020 12/16/2020 3535101 Commercial Building REPAIR BASE METER
T20CM03455 Expired 06/06/2020 12/16/2020 3535102 Commercial Building REPAIR BASE METER
T20CM03455 Expired 06/06/2020 12/16/2020 3535103 Commercial Building REPAIR BASE METER
T20CM03455 Expired 06/06/2020 12/16/2020 3535104 Commercial Building REPAIR BASE METER
DP12-0011 Complete 01/17/2012 07/27/2020 Development Package SITE FOR NEW COVERED PARKING & ENTRY SIGN
CD985-062A CLOSED 01/26/1997 N/A DPHIST DEL MORAL APARTMENTS
CD985-062C CLOSED 01/26/1997 N/A DPHIST LAS MONTANAS APARTMENTS
T01EL01529 FINAL 06/12/2001 12/11/2001 BLDG #06 ELECT RECONNECT:ELECTRIC APARTMENTS
T05CM06180 FINAL 12/13/2005 10/15/2006 12 COMBO REPAIR:VEHICLE DAMAGE
T08CM01281 FINAL 04/22/2008 06/16/2009 BLDG#53 COMBO REPAIR: FIRE DAMAGE (T08DV01712) APT. UNIT
T09AN00397 ISSUED 07/10/2009 N/A BLDG 62 ADDRNEW
T09OT01421 C OF O 07/13/2009 02/01/2010 BLDG 62 C-OF-O C OF O: DAY CARE
T10EL00267 FINAL 02/08/2010 08/10/2010 BLDG#53 ELECT RECONNECT:ELECTRIC:APT
T11BU01624 FINAL 12/08/2011 11/12/2012 POOL/SPA DEMO EXISTING POOL AND CONSTRUCT NEW POOL FOR APARTMENT COMPLEX
T11CM03269 FINAL 10/13/2011 09/24/2012 1 COMBO TI:REMODEL MULTI PURPOSE BLDG/NEW PATIO COVER
T11EL00723 FINAL 03/11/2011 09/11/2011 26 ELECT RECONNECT:ELECTRIC APT
T11EL01229 FINAL 04/29/2011 01/07/2012 36 ELECT ELEC RECONNECT
T11EL01540 FINAL 06/03/2011 12/04/2011 1 ELECT REPLACE ELECTRICAL BREAKER FOR TOWNHOUSE
T11EL01645 FINAL 06/14/2011 12/12/2011 24 ELECT RECONNECT:ELECTRIC:APT
T11EL01953 FINAL 07/21/2011 01/18/2012 32 ELECT REPLACE ELECTRICAL BREAKER FOR TOWNHOUSE (APA)
T11EL02407 FINAL 09/09/2011 03/10/2012 31 ELECT REPLACE: MAIN BREAKER 100AMP: RES (APA)
T11EL02507 FINAL 09/22/2011 03/21/2012 30 ELECT REPLACE MAIN BREAKER (APA)
T11EL02545 WITHDRWN 09/27/2011 03/25/2012 31 ELECT REPLACE MAIN BREAKER 100 AMP: RES (APA)
T12CM00244 EXPIRED 02/01/2012 03/03/2018 COMBO INSTALL:PHOTOVOLTAIC SYSTEM
T12CM00620 FINAL 02/23/2012 12/16/2012 COMBO 13 PARKING CANOPIES THRU OUT SITE.
T12EL00032 FINAL 01/04/2012 07/04/2012 BLDG#53 ELECT RECONNECT:ELECTRIC:APT-#53102
T14CM07411 FINAL 10/31/2014 05/03/2015 23 COMBO REPL MAIN BREAKER (APA)
T14CM08013 FINAL 11/21/2014 03/13/2016 32 COMBO REPL 100 AMP MAIN BRKR & BUSSING (APA)
T15CM01656 FINAL 03/12/2015 09/13/2015 25 COMBO REPLACE MAIN BREAKER & BUSSING - LIKE-FOR-LIKE (APA)
T15CM01746 FINAL 03/16/2015 09/22/2015 25 COMBO REPLACE MAIN BREAKER & BUSSING - LIKE-FOR-LIKE (APA)
T15CM05766 WITHDRWN 08/18/2015 02/14/2016 25 COMBO REPLACE MAIN 100 AMP VREAKER AND BUSSING LIKE FOR LIKE. (APA)
T15CM05767 FINAL 08/18/2015 02/21/2016 1* COMBO REPLACE MAIN 100AMP BREAKER AND BUSSING LIKE FOR LIKE (APA)
T15CM06877 FINAL 10/05/2015 04/05/2016 28 COMBO 4 METER PACK REPLACEMENT LIKE FOR LIKE;APTS
T17CM09469 FINAL 12/27/2017 07/02/2018 17 COMBO REPL BUSSING & METER SOCKET
T18CM00803 FINAL 01/31/2018 08/01/2018 BLDG#3 COMBO ELECTRICAL RECONNECT
T18CM00922 FINAL 02/06/2018 08/12/2018 4 COMBO REPLACE BUSSING BREAKER
T18CM01687 FINAL 03/02/2018 09/02/2018 28 COMBO ELECTRIC RECONNECT
T19CM06227 FINAL 08/27/2019 02/25/2020 COMBO ELECTRICAL UPGRADE NOT GREATER THAN 200AMPS
T19RW07672 FINAL 12/23/2019 01/25/2020 ROW (2) 5X5 bellholes in dirt/blktop on Del Moral Blvd---- to repair/replace gas line
T20RW00997 FINAL 02/18/2020 04/18/2020 ROW 2 5x5 bellholes in dirt/blktop front---- to repair/replace gas line OLD PERMIT T19RW07672
T20RW02780 FINAL 05/15/2020 09/21/2020 ROW 2 5X5 bellholes in dirt/blktop -----to repair/replace gas line (Previous Reference permit T20RW00997) WORK LOCATION IS ON S DEL MORAL BL

Code Enforcement

Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Code Cases - (8)
Case Number Case Status Entered Date Exp Date Unit Type Description
CE-VIO0723-04639 Closed - Resolved 07/19/2023 08/24/2023 BLDG 14 UNIT 14104 High Priority / Unit 14104 / No AC
CE-VIO0723-04596 Closed - Resolved 07/17/2023 07/20/2023 BLDG 31 UNIT 31101 RMIN / High Priority / Unit 31101 / No Ac last 7 days
CE-VIO0324-01189 Closed - Resolved 03/28/2024 08/01/2024 PMMULT : Property maintenance deficiencies and need structure repairs.
CE-VIO0723-04416 Closed - Resolved 07/07/2023 08/23/2023 BLDG 28 UNIT 28103 RMIN - Apt # 28103, No a/c
CE-VIO0723-04741 Closed - Resolved 07/25/2023 08/24/2023 BLDG 17 UNIT 17101 Medium Priority - Unit 17101 - AC is not functioning correctly unit is reading temperatures above 80 degrees. No temporary cooling provided
CE-VIO0723-04751 Closed - Resolved 07/25/2023 08/24/2023 BLDG 2 UNIT 2103 HIGH PRIORITY - RMIN - UNIT 2103 - No AC - AC unit will not turn on at all.
CE-VIO0523-03661 Closed - Resolved 05/22/2023 06/27/2023 BLDG 20 UNIT 20101 RMIN / Unit 20101 / Hole in ceiling from AC condensation on roof, some electrical outlets don't work in unit
CE-VIO0523-03701 Closed - Resolved 05/23/2023 05/26/2023 BLDG 3 RMIN : UNIT# 31101 / No AC for 6 days, provided portables but they blew the fuse.

Plans

Address: 6280 S CAMPBELL AV
Date - 12/23/2024 5:29 p.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
T05BA00183 Approved 06/30/2005 N/A -- Stormwater Basin