Permit: T11CM03219

Parcel: 133243700

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T11CM03219

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
01/09/2012 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
12/15/2011 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) EXPLAINED TO STEVE 272-0621 THAT ENGINEERING IS REQUIRED TO CHANGE TYPE OF HYDRO MECHANICAL INTERCEPTOR AND THAT I CANNOT GIVE ANY APPROVAL WITHOUT A CITY APPROVED REVISION
2) FLOW CONTROL MAY NOT BE BURRIED BELOW SLAB
3) A 3 X 2 RESTRICTION AT OUTLET IS A CODE VIOLATION
4) INTERCEPTOR REQUIRES A VENT
5) PLEASE HAVE ALL OF YOUR CHANGES REVISED AND APPROVED
6) PROVIDE REVISION TO PLUMBING INSPECTOR
12/13/2011 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
11/29/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) INSTALLED PER RED LINES WITH 2" GW FOR 3 FIXTURES
2) PROVIDE REVISION PRIOR TO FINAL
3) PROVIDE A 2" INTERGAL FLOW CONTROL INTERCEPTOR
11/28/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) SOIL PIPING WITH TEST OK, CORRECT VENT 90 AND VENT TAKE OFF
2) COMPLETE GW CHANGES AND RED LINE ALL CHANGES TO PLAN