Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) DWV IN WALL TEST OK 2) PROVIDE 1/4" PER ROOT SLOPE AND SUPPORT AS REQUIRED 3) INSTALL CLEANOUT AND SAFETY PLATES AND T & P DRAIN 4) INSTALL FOAM WRAPS AT FLOOR PENETRATIONS |