Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2011 | MECHANICAL - INTERMEDIATE | Approved | IVRS - Inspection :* 1) INCREASE CONDENSATE TO 1" AT THE 1ST TEE 2) EXTEND VENTS IN DRAIN LINES ABOVE DRAIN PANS 3) USE A 1" 90 DEGREE ELBOW AT CONDENSATE TERMINATION 4) FOR FINAL I.D. AIR HANDLER AND CONDENSORS 5) PROVIDE ACCESS TO THE ROOF 6) PROVIDE AIR BALANCE REPORT |