Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG PIPING FLUSH
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2012 | FIRE SPKLR - UG PIPING FLUSH | Approved | flushed all lines. | |
| 01/03/2012 | FIRE SPKLR - UG PIPING FLUSH | Partial Approval | Stainless steel stub and 46 feet of 4 inch ductile pipe with restraints and meg-a-lugs. Ok to bury. Location: Pantano School on N/W corner. |
|
| 12/06/2011 | FIRE SPKLR - UG PIPING FLUSH | Partial Approval | 10" stainless steel stub and 10' C-PVC with bolt clamps and thrust block approved okay to bury. Need separate plan and permit for sprinkler and underground piping for fire systems need separate for all systems that are checked off on front of approved plans. |