Permit: T11CM00617

Parcel: 116206350


Addresses:

125 S LINDA AV

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
05/20/2012 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
04/03/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT ON SITE WALL PROGRESS AREA
03/30/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
03/28/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) TOP OUT ON INFILL
03/27/2012 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
03/23/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT 6TH FLOOR IN FILL
03/23/2012 REINFORCED MASONRY PRE-GROUT Partial Approval 1) 2ND LIFT AT 6TH FLOOR INFILL
03/22/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) IN FILL UP TO 6TH FLOOR
03/21/2012 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
03/16/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 2ND LIFT 5TH FLOOR IN FILL
03/15/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT 5TH FLOOR IN FILL
03/14/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 4TH FLOOR INFILL
03/12/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 2ND LIFT INFILL
03/09/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT 2ND FLOOR INFILL
02/10/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
02/09/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ELEVATOR SHAFT AT ----
02/08/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
GL B-M/1 & 2 PARAPET OK
GL A-M/6 & 7 PARAPET OK
01/25/2012 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
01/24/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) TOP OUT PARAPET ON EAST WING
01/23/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) PARAPET ON GL: Q/1-9, 2ND LIFT P/1-7 EAST WING
01/21/2012 REINFORCED MASONRY PRE-GROUT Partial Approval 1) GL P/7.5 1ST LIFT, 2ND LIFT ON ELEVATOR SHAFT THE FLOOR
2) AFTER HOURS INSPECTION $165.00 PAID WITH CHECK #10750
01/20/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL M/1-7 2ND LIFT 6TH FLOOR AND 1ST LIFT ON ELEVATOR SHAFT 6TH FLOOR
01/19/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: K/1-7 2ND LIFT 6TH FLOOR, M/1-7 1ST LIFT 6TH FLOOR
01/18/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: J/2-7 2ND LIFT 6TH FLOOR
01/17/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) J-M/2-7 1ST LIFT 4TH FLOOR
01/13/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL H & J/1-7 1ST LIFT, G & H/1-7 2ND LIFT 6TH FLOOR
01/12/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: C-F/4 2ND LIFT, G/4-7, D/4-7, F/4-7 M/ 2ND LIFT 6TH FLOOR
01/11/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: B.8/4-7, C/2-4, C-F/2 ALL 2ND LIFT 6TH FLOOR
01/10/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL D-G/4-7 1ST LIFT 6TH FLOOR, G/2-4 1ST LIFT, D-J/7 1ST LIFT 6TH FLOOR
01/09/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: G-J/1 1ST LIFT, G/2-4 1ST LIFT 6TH FLOOR
01/06/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: C-G/1 1ST LIFT 6TH FLOOR, 4-7/A 1ST LIFT AND C/4-7 1ST LIFT 6TH FLOOR
01/05/2012 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
1) GL: B/1-4 BOND BEAM, C/2-4 BOND BEAM
12/28/2011 REINFORCED MASONRY PRE-GROUT Partial Approval 2nd lift/ 5th floor/ east wing complete
12/27/2011 REINFORCED MASONRY PRE-GROUT Partial Approval 5TH FLOOR/ 1ST LIFT/ EAST WING
12/22/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12/21/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: 3-12/Q 1ST LIFT 5TH FLOOR, .05-8.5/P 1ST LIFT 5TH FLOOR
12/20/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: Q/1-8 1ST LIFT 5TH FLOOR
12/19/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) H/1-7 1ST LIFT, J/1-7 ?, K/1-7 1ST LIFT, M/1-7 1ST LIFT 5TH FLOOR
12/19/2011 REINFORCED MASONRY PRE-GROUT Partial Approval 1) GL: J/1-7, K/1-7, M/1-7 2ND LIFT 5TH FLOOR
12/15/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) J/1-3 2ND LIFT 5TH FLOOR AND G-J/1 2ND LIFT 5TH FLOOR
12/13/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
12/12/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection CANCELLED DUE TO RAIN
12/09/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL F/4-7, E/4-7, G-4-7 2ND LIFT 5TH FLOOR, F-J/7 2ND LIFT 5TH FLOOR
12/08/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: 5-7/B.7-C 2ND LIFT, F/2-4 2ND LIFT, G/2-4 2ND LIFT 5TH FLOOR
12/07/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: A/4-7 2ND LIFT, 4/A-F 2ND LIFT, C/2-4, D/2-4 2ND LIFT 5TH FLOOR
12/06/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
12/05/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL E/4-7, J/1-7 1ST LIFT 5TH FLOOR
12/02/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
12/01/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) A/4-7, D/2-7, C/2-4, E/2-4, F/2-7 1ST LIFT 5TH FLOOR
11/30/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: C-F/4-1ST LIFT 5TH FLLOR, 7/A-J 1ST LIFT 5TH FLOOR, STAIRWAY 1ST LIFT 5TH FLOOR
11/29/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: 2/A-G 1ST LIFT 5TH FLOOR
11/28/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
11/23/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: M.5/7-8 1ST LIFT 4TH FLOOR
11/22/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: M.5-K/9-15 2ND LIFT 4TH FLOOR, 10-14/?-M 2ND LIFT 4TH FLOOR
11/21/2011 REINFORCED MASONRY PRE-GROUT Partial Approval 1) GL: 1-8/P 2ND LIFT 4TH FLOOR, 3/P-Q 2ND LIFT, 6/M.5-P.5 2ND LIFT, 8/M.3-P.3 2ND LIFT 4TH FLOOR
11/18/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*.
1) GL: P/1-2; P-Q/2, ?/1-9 ALL 2ND LIFT 4TH FLOOR
11/17/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) M.-Q/4-15 1ST LIFT 4TH FLOOR, M-M.5/2-3 2ND LIFT 4TH FLOOR
11/15/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL M-N/2-3 1ST LIFT 4TH FLOOR, P/1-8 1ST LIFT 4TH FLOOR, Q/1-14 1ST LIFT 4TH FLOOR
11/14/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
11/10/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALL AT 9' 4" GL: M/1-7 OK TO GROUT PROGRESS AREA (4TH FLOOR)
11/09/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL M/2-7 1ST LIFT 4TH FLOOR
11/08/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
11/08/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL G-J/2-7 2ND LIFT 4TH FLOOR
11/04/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
11/03/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: C-F/2-7 2ND LIFT 4TH FLOOR
11/02/2011 REINFORCED MASONRY PRE-GROUT Partial Approval 1) GL A-C/2-7 2ND LIFT 4TH FLOOR
11/01/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL H-K/2-7 1ST LIFT 4TH FLOOR
10/31/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL C-G/2-7 1ST LIFT 4TH FLOOR
10/28/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL 7/A-E 1ST LIFT 4TH FLOOR, 2/A-G 1ST LIFT 4TH FLOOR, B/2-4 1ST LIFT, A/4-7 1ST LIFT 4TH FLOOR
10/27/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
10/26/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: 9-13/K 2ND LIFT 3RD FLOOR
10/25/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL 15/J-K 2ND LIFT 3RD FLOOR
10/24/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) STAIRWELL (C114) AT 9' 4", 3RD AFFE ALL WALLS; CMU WALLS AT 56" AFFE-3RD FLOOR; GL: 9/M-P; 11/M-P; 13/M-P OK TO GROUT PROGRESS AREAS
10/21/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU EAST CORRIDOR WALL AT 9' 4" AFFE 3RD FLOOR; GL: P/1-8; CMU WALLS AT 9' 4" GL: 10/O-Q 12/O-Q; SOUTHEAST STAIRWELL (C114) SOUTH WALL-26' 4" AFFE. OK TO GROUT PROGRESS AREAS
10/20/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALLS AT 9' 4" ABOVE 3RD F.F.E. GL: 1/P-Q, 3/P-Q, 6/P-Q; 8/P-Q; 3/M-O OK TO GROUT PROGRESS AREAS
10/19/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) (C114) SOUTHEAST STAIRWELL AT 20' 4"; 3RD FLOOR CMU WALLS AT 56" AFFE; GL: Q/8-14; 10/O-Q; 12/O-Q; 14/O-Q; 6/O-Q OK TO GROUT PROGRESS AREAS
10/18/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL P-4/1 1ST LIFT 3RD FLOOR, P/1-6 1ST LIFT 3RD FLOOR; P-M.5/1-8 1ST LIFT 3RD FLOOR
10/17/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL M-P/1 1ST LIFT 3RD FLOOR, 1ST FLOOR ELEVATOR SHAFT 3RD FLOOR AND P/1-2 1ST LIFT 3RD FLOOR
10/13/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL J-M/2-7 2ND LIFT 3RD FLOOR
10/12/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL M/2-7 2ND LIFT 3RD FLOOR
10/11/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT GL K/2-7 3RD FLOOR, GL J-K/4-7 2ND LIFT 3RD FLOOR
10/10/2011 REINFORCED MASONRY PRE-GROUT Partial Approval 1) GL C-F/4-7 2ND LIFT 3RD FLOOR, GL G./2-4 2ND LIFT 3RD FLOOR
2) AFTER HOURS INSPECTION PAID WITH CHECK #153 FOR $165.00
10/07/2011 REINFORCED MASONRY PRE-GROUT Partial Approval 1) GL E/F/2-7 2ND LIFT 3RD FLOOR D-F/4 2ND LIFT 3RD FLOOR
10/06/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
10/05/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
G.L. B-F/2-7
1ST LIFT 3RD FLOOR
10/03/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL A/2-7 1ST LIFT 3RD FLOOR
10/02/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
1) GL 8-12/M-P 2ND LIFT 2ND FLOOR
09/29/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL 9-15/K 2ND LIFT 2ND FLOOR
09/28/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL 8/0 1ST LIFT AND 1/P-Q 2ND LIFT
09/27/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL 12-14-15/M-J 1ST LIFT 2ND FLOOR
09/23/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
GL P/38 1ST LIFT PROF 5-8 1ST LIFT 2ND FLOOR
09/22/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT ON ELEVATOR SHAFT 2ND FLOOR; GL: 1/P-Q 1ST LIFT, 1-3/P 1ST LIFT ALSO 2ND FLOOR
09/21/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL K-M/2-7 2ND LIFT ON 2ND FLOOR
09/20/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL J/2-7 2ND LIFT 2ND FLOOR
09/19/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL G-H/2-7 2ND LIFT 2ND FLOOR
09/16/2011 REINFORCED MASONRY PRE-GROUT Partial Approval 1) GL B-G/4-7 2ND LIFT 2ND FLOOR
09/15/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL H-J/2-4 2ND LIFT 2ND FLOOR, 2/H-J 2ND LIFT AND ?/H-J 2ND LIFT 2ND FLOOR
09/13/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
1) 1ST LIFT 2ND FLOOR GL G-K/4-7
2) REMOVE WATER AWAY FROM BLDG
09/13/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 2ND FLOOR GL A/2-7, 2ND LIFT C-D/2-4 2ND LIFT, GL M/2/7 1ST LIFT
09/09/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2ND FLOOR:
1) INTERIOR WALLS AT 56" GL: D/4.5-7; H,J,K/2.4 OK TO GROUT PROGRESS AREAS
09/08/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 2ND FLOOR: PATIO WALLS GL: 7/A-E; INTERIOR MASONRY WALLS GL: 4.5/A-E; E/4-5.7
NOTE: ENSURE M.C.J. IS CUT IN STAIRWELL WALL AT GL: C/4-7 (MISSED)
09/07/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) PATIO OPENINGS GL 2/A-P; INTERIOR WALLS AT B-G, 2-4 AT 56" OK TO GROUT PROGRESS AREAS
09/06/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
09/01/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3RD LIFT ELECTOR GLL/15/8 3RD LIFT
08/31/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL P/1-8 3RD LIFT, 3/P-Q 3RD LIFT, 4/P-Q 3RD LIFT; 8/P-Q 3RD LIFT
08/30/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL ?/J-M
2) 8' LIFT ON ELEVATOR
08/29/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL M-Q 7-12 8' LIFT
08/26/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL N-6/7-? 4' LIFT, Q/1-12 4' LIFT
08/25/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
G.L. P-Q/1 4' LIFT, P-Q/3 4' LIFT, M.C.-Q/6 4' LIFT
M-D/1 4' LIFT
08/24/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
K-M/1.8-7 3RD LIFT, J-M-5/14-15 1ST LIFT
08/23/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ELEVATOR 2ND LIFT 12' LIFT G-K K-M 1-6.5 12' LIFT
08/22/2011 REINFORCED MASONRY PRE-GROUT Partial Approval GL J-M 2ND LIFT, K 1-6 2ND LIFT, M1-6 1ST LIFT
08/19/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
GL J/2.7 4' LIFT
08/18/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL C-D/4-7 12' LIFT, J/2-4 4' LIFT
08/17/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL M/4-7 1ST LIFT, C/4-7 12' LIFT, E & F/4-7 12' LIFT
08/16/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL C/4.5-7 8' LIFT AND G-J/1 4' LIFT
08/15/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) NORTH WING: GL: 2/A-G AT 12' 8"; INTERIOR WALLS AT GL 4-7 AT 12' OK TO GROUT PROGRESS AREAS
08/11/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL 1ST LIFT C-D/4-7, G/4-7 2ND LIFT 4-7(A-C.5 2ND LIFT
08/10/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 2ND LIFT E-F/R, E-6/2-4 F/2-7, E/4-7 1ST LIFT
08/09/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 2ND LIFT GL A/2-7, 4/A-D, C/2-4 AND D/2-4
08/05/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT C-F/2-4
07/26/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 4' LIFT GL Q/1-15 B-5/2
07/15/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) STEM AT GL 3-6/P, 4TH LIFT AT ELEVATOR PIT
07/14/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
07/13/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) STEM AT GL 15-8/K-M, K-M/1-6 OK
07/12/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT ON ELEVATOR SHAFT
07/11/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) STEM AT GL A-F/2-7
07/07/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 3-14/P